LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2015 >> Q3 Prestige >> Repair and Diagnosis >> External Pages >> Different car >> Section 7 (Crankshaft & Cylinder Block (Ea 888 Generation III) (2017-2018)) >> 13 Crankshaft, Cylinder Block >> Pistons And Connecting Rod >> Overview - Pistons And Connecting Rod

Overview - Pistons And Connecting Rod

WARNING: This page is about a different car, the 2018 Audi Q3 Quattro, 2018 Audi Q3, 2017 Audi Q3 Quattro, and 2017 Audi Q3. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Pistons And Connecting Rod Exploded View
GWWA13-11033Courtesy of AUDI OF AMERICA, LLC
  1. Bolts
    • 45 Nm + 90°
    • Always replace after removing
    • Coat the threads and contact surfaces with engine oil
    • Use the old bolts for radial clearance measurement
  2. Connecting Rod Bearing Cap
    • Note the installation position
    • Due to the separation procedure (cracking) of the connecting rod, the connecting rod bearing cap only fits in one position and only to the corresponding connecting rod.
    • Use a color to mark the cylinder and connecting rod to which it belongs -A-
    • Installation position: the marks -B- face the belt pulley side
    • Separating the new connecting rod. Refer to NEW CONNECTING ROD, SEPARATING .
  3. Bearing Shells
    • New: 0.10 to 0.35 mm
    • Wear limit: 0.40 mm.
  4. Connecting Rod
  5. Relief Valve
    • 27 Nm
  6. Oil Spray Jet
  7. Circlip
    • Always replace after removing
  8. Piston Pin
    • Coat with engine oil before installing
  9. Piston
  10. Compression Rings
    • Offset gaps by 120°
    • Install with Piston Ring Pliers :VAS211003  . Refer to Fig 4.
    • Allocation and installation position. Refer to Fig 3.
    • Checking the piston ring gap. Refer to Figure.
    • Checking the groove clearance. Refer to Figure.
  11. Oil Scraping Ring
    • Two or three part depending on the version.
    • Carefully remove and install the three-part oil scraping ring by hand
    • Install the upper joint of the 3-part oil scraping ring 120° offset to the neighboring compression ring
    • Piston ring gap is not measurable
    • Side clearance cannot be measured.
    • Installation position. Refer to Fig 5.
    • Allocation. Refer to Fig 3.
Fig 2: Installed Position of Bearing Shell
GWWN13-10566Courtesy of AUDI OF AMERICA, LLC

-- Place the bearing shells centrally into connecting rod and connecting rod bearing cap.

Fig 3: Allocation of the Piston Ring in Connection with the Three-Part Oil Scraping Ring
GWWA13-11052Courtesy of AUDI OF AMERICA, LLC
  1. Compression ring with bevel -arrow A- on the upper side inside. >>TOP<< marking or lettering points upward
  2. Compression ring offset -arrow B- on the bottom outside. >>TOP<< marking or lettering points upward
  3. Three Part Oil Scraping Ring
Fig 4: Installing the Compression Ring
GWWA13-11255Courtesy of AUDI OF AMERICA, LLC
Fig 5: Three-Part Oil Scraping Ring
GWWA15-12030Courtesy of AUDI OF AMERICA, LLC

-- Pay attention to the spring installation position: 

-- Install by hand.

Installation sequence: 

-- 1. Insert the spring -1- in the groove.

-- 2. Insert the lower plate -3- in the groove.

-- 3. Insert the upper plate -2- in the groove.

Fig 6: Oil Spray Jets Installation Position
GWWA13-11038Courtesy of AUDI OF AMERICA, LLC