LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2012 >> Q7 3.0 TDI >> Repair and Diagnosis >> External Pages >> Different car >> Section 50 (4.2L - Cylinder Head & VALVETRAIN - Engine Code: Bar) >> 15 Cylinder Head, VALVETRAIN >> Removal And Installation >> Power Take-Off Drive Chain >> Installing

Power Take-Off Drive Chain: Installing

WARNING: This page is about a different car, the 2010 Audi Q7, 2009 Audi Q7, 2008 Audi Q7, and 2007 Audi Q7. However, it is still accessible from the selected car via links, so may be relevant.

Installation is in reverse order of removal, note the following:

NOTE:

Replace gaskets.

Secure all hose connections with hose clamps appropriate for the model.

-- Install lower timing chain cover. Refer to LOWER TIMING CHAIN COVER .

-- Install the crankshaft seal on the transmission side. Refer to CRANKSHAFT SEAL, TRANSMISSION SIDE .

-- Install oil filter housing. Refer to OIL FILTER HOUSING .

-- Install intake manifold. Refer to INTAKE MANIFOLD, REMOVING AND INSTALLING .

-- Install left and right timing chain covers. Refer to LEFT AND RIGHT TIMING CHAIN COVERS .

-- Install drive plate. Refer to DRIVE PLATE .