Reducing Agent Delivery Unit, Removing And Installing: Installation
- Tightening specifications. Refer to REDUCING AGENT ACTIVE TANK AND ATTACHMENTS OVERVIEW .
Replace seal.
Thoroughly clean the sealing ring surfaces.
-- Install the reducing agent delivery unit -2- in the active tank. Slide the heating element through the gap between the reducing agent delivery unit and installation opening into the active tank.
-- Stretch the new sealing ring -1- over the reducing agent delivery unit and place it on the installation opening.
-- Bring the reducing agent delivery unit into the installation position:
- The tab -arrow A- on the reducing agent delivery unit must fit into the groove -arrow B- on the rim of the opening for the active tank.
-- Install the new union nut -2- so that the marking -3- lines up a the beginning of the first thread -4-. The arrow marking -1- on the active tank is found here.
-- First tighten the new union unit by hand, then tighten it using the Wrench - Union Nut T50014 for a total of 5 /4 turns (450°).
- The marking -3- on the new union nut -2- must align with the marking -1- (the arrow lines up with the lines on the side).
Install in reverse order of removal. Note the following:
-- Install the reducing agent active tank. Refer to REDUCING AGENT ACTIVE TANK, REMOVING AND INSTALLING .
-- Adapting Adaptation Value after Draining Reducing Agent or Replacing Components. Refer to ADAPTING ADAPTATION VALUE AFTER DRAINING REDUCING AGENT OR REPLACING COMPONENTS .