Coolant Shut-Off Valve, Removing And Installing: Installing
WARNING: This page is about a different car, the 2015 Audi Q7, 2014 Audi Q7, and 2013 Audi Q7. However, it is still accessible from the selected car via links, so may be relevant.
Install in reverse order of removal. Note the following:
Tightening specifications:
- Refer to OVERVIEW - EXHAUST GAS RECIRCULATION
- Refer to OVERVIEW - COOLANT SHUT-OFF VALVE .
NOTE:
Replace the seals and the O-ring.
Secure all hose connections with standard production hose clamps. .
-- Install the engine oil cooler. Refer to ENGINE OIL COOLER, REMOVING AND INSTALLING .
-- Install the exhaust gas recirculation cooler. Refer to EXHAUST GAS RECIRCULATION (EGR) COOLER, REMOVING AND INSTALLING .
-- Attach the EGR pipe to the turbocharger. Refer to Fig 1.