Coolant pipes, assembly overview: Notes
WARNING: This page is about a different car, the 2010 Audi A8, 2009 Audi A8, 2008 Audi A8, and 2007 Audi A8. However, it is still accessible from the selected car via links, so may be relevant.
1 - Front coolant line
- Removing and installing → Front coolant line, removing and installing
2 - Bolt
- Replace
- 8 Nm additional 90° (1 /4 turn).
3 - O-ring
- Replace
4 - Bolt
- 9 Nm
5 - Right coolant line
- Removing and installing → Right coolant pipe, removing and installing
6 - Coolant hose
7 - O-ring
- Replace
8 - Engine Coolant Temperature (ECT) Sensor G62
- Removing and installing → Engine Coolant Temperature (ECT) Sensor G62, removing and installing
9 - O-ring
- Replace
10 - Retaining clip
11 - Bolt
- 9 Nm
12 - Rear coolant pipe
- Removing and installing → Rear coolant line, removing and installing
13 - Bolt
- 9 Nm
14 - Bolt
- 9 Nm
15 - O-ring
- Replace
16 - Coolant hose
17 - Bolt
- 9 Nm
18 - Bolt
- Tightening torque → Engine, installing
19 - Left coolant line
- Removing and installing → Left coolant pipe, removing and installing
20 - Lower left coolant pipe
- Removing and installing → Lower left coolant pipe, removing and installing
21 - Bolt
- 9 Nm
22 - Bolt
- Tightening torque → 87 - AIR CONDITIONING
23 - O-ring
- Replace
24 - Bolt
- Replace
- 8 Nm additional 90° (1 /4 turn).
25 - Seal
- Replace
26 - Drain plug
- 10 Nm