Sun Roof [2016-2018]: Finishing
INSTALLING THE APRON MOLDING AND CHECKING THE SUN ROOF
Remove the plastic strip from rear edge.
Install the apron molding. See: APRON MOLDING SUNROOF .
Operate the sun roof and check that the measurements at the front and rear edges of the glass are correct.
Check that the fuel tank filler cover is sealed as regards wind noise and water-tightness.