Installing The Control Module
- Take the cable harness and control module from the kit. Connect the cable harness to the control module (1).
- Lock the catch (2).
- Get a thick foam tape from the kit and fasten it on the front of the control module. Fold up the foam tape around the corners and edges of the control module.
- Get three small pieces of foam tape from the kit and fasten these on the back of the control module.
- Detach the front sill molding by first pulling it backwards at the front edge and then straight up so that the clips release.
- Unscrew the clips holding the floor carpet.
- Fold aside the floor mat to access the bulkhead panel inside.NOTE: Take care not to create folds in the carpet.
- Place the control module with the thick foam tape forward, against the bulkhead.
- Fold aside the cable harnesses (1) so that they do not end up between the control module and floor mat.
- Route the control module's cable harness under the cable harnesses (2) and on toward the tunnel console.