Checking the wiring and the relay
Check the cable between A/C relay base terminal 3 and the magnetic clutch for an open-circuit according to Open-circuit, permanent faults
HINT: With the ignition on and the cable connected between 1 and 3 in the A/C relay base, the magnetic clutch should be activated.
Other information:
- A/C relay base terminal 1 is supplied with power from the system relay via fuse 11B/16
- A/C relay base terminal 3 is connected to the magnetic clutch
- For information about signals on 5-cylinder engines, see Signal specification .
- For information about signals on 6 cylinder engines:
- For 6 cylinder engines -2001, see Signal specification
- For 6 cylinder engines 2002-, see Signal specification
- For 6 cylinder engines -2004, see Signal specification
- For 6 cylinder engines 2005-, see Signal specification .
- Continue
Refer to Verification