Installing Components
Fig 1: Trigger Wheel, Camshaft Position (CMP) Sensor Housing & Pipe Screw For Water Heated Crankcase Ventilation At Rear Of Cylinder Head
Install
- the trigger wheel.
- the camshaft position sensor housing, lower screw only.
- the pipe screw for the water heated crankcase ventilation at the rear of the cylinder head. Use new seal washers. Tighten to 26 Nm .
- the cover at the rear edge of the intake camshaft.
Fig 2: Connectors For Variable Valve Timing Solenoids, Connector For Coolant Temperature Sensor & Screws For Ignition Coils And Two Ground Terminals
Install
- ignition coils using previous markings.
- the connector for the coolant temperature sensor.
- the connector for the variable valve timing solenoid.
- the screws for the 2 ground terminals between ignition coils 1 and 2 and 5 and 6.
Install below the intake manifold
- the starter motor.
- the throttle body (TB) connector to the engine wiring.
- the charge air pipe to the throttle body. Tighten the clamp.
- the control hose to the charge air bypass valve.
- the brake vacuum hose to the intake manifold.
- the bracket and screw to the lower row of screws at the mounting for the intake manifold on the cylinder head.
- the pipe screws at the underside of the intake pipe for the water heated crankcase ventilation. Tighten to 26 Nm .
- the dipstick tube to the intake manifold.
Install
- the cable duct on the inside of the right suspension turret.
- the front timing cover.
- the expansion tank. Connect the connector to the coolant level sensor.
- the hose to the expansion tank from the radiator. Secure the clamp and remove the lock grip pliers.
Connect the connector to the ABS sensor.
- servo reservoir. Ensure that the hoses are correctly positioned.
Install
- the upper timing cover.
- the cover over the ignition coils.
- the plastic intake pipe over the engine. Adjust and tighten the intake pipe at the turbocharger. Tighten the clamps and mounting screws on the plastic pipe.
- the plastic charge air pipe over the engine. Tighten the clamps and mounting screws.
- the hose between the charge air cooler and the plastic charge air pipe over the engine. Tighten the clamps.
- the crankcase ventilation hose to the PTC resistor in the plastic intake pipe over the engine. Use a new clamp.
- the connector for the PTC resistor.
- the protective cover over the PTC resistor.
- the EVAP valve hose to the plastic intake pipe.
- the bypass valve outlet hose to the plastic intake pipe. Tighten the clamp.
- the air cleaner assembly. Press the air cleaner intake pipe into the front plate port.
- the plastic intake pipe to the mass air flow sensor. Tighten the clamp.
- the connector to the mass air flow sensor. Clamp the wiring at the front edge of the air cleaner.
- the turbocharger control valve to the mounting on the air cleaner
- the blue-marked hose/turbocharger control system to the intake manifold.
- the red-marked hose/turbocharger control system to the charge air pipe.
- the yellow-marked hose/turbocharger control system to the pressure regulators.
- the cross stay between the suspension turrets
- the suspension turret covers.
Clamp the servo hose to the right mounting on the cross stay.
Fig 1: Battery Negative Lead, Radiator Breather Tube By Expansion Tank, Right-Hand Drive Shaft, Bearing Seat & Pipe Screw
Tighten the pipe screw of the oil pressure pipes to 38 Nm .
Install the drive shaft bearing seat.
Install
- the right-hand drive shaft and viscous coupling. See Drive shaft right, replacing .
- the wheels. See Installing wheels .
- the battery negative lead. Also read Battery, disconnecting .