Installing The Flange
Install the flange on the AOC (Active on Demand Coupling) using the previous markings (if using the old flange).
Install a new nut for the shaft and flange. Use counterhold 9995652 with adapter 9995744 .
Tighten the nut. Tighten to 100 Nm .
Fill the AOC (Active on Demand Coupling) with oil. Check the oil level. See Active on Demand Coupling (AOC), replacing .