A-Pillar Cover, Removing And Installing: Removing
-- Remove the drip rail. Refer to Drip Rail, Removing and Installing .
-- Heat up the A-pillar cover -1- in the area near the adhesive tape -2- using the Hot Air Blower:VAG1416 . Refer to Installation Requirements for Components with Adhesive Tape .
-- Position a commercially available plastic wedge in the direction of -arrow A- between the A-pillar -3- and the A-pillar cover -1-.
-- When the bonded joint is loosened, remove the A-pillar cover -1- in the direction of -arrow B- from the A-pillar -3-.