LEMON Manuals: Even more car manuals for everyone
Home >> Volkswagen >> 2022 >> Jetta GLI Autobahn, Standard Trans >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> Turbocharger, Supercharger 4-Cylinder Direct Injection (2.0L, 4V) >> 21 Turbocharger, Supercharger >> Turbocharger >> Turbocharger, Removing And Installing >> Installing

Turbocharger, Removing And Installing: Installing

Install in the reverse order of removal while noting the following:

NOTE:

Replace seals, gaskets, O-rings and self-locking nuts.

Coat the stud bolts on the turbocharger with hot bolt paste; hot bolt paste. Refer to the appropriate service information. .

Fill the turbocharger with engine oil at the oil supply line connection.

Hose connections and charge air system hoses must be free of oil and grease before installing.

Secure all hose connections with standard production hose clamps. Refer to the appropriate service information. .

-- Install the front exhaust pipe with the catalytic converter. Refer to CATALYTIC CONVERTER, REMOVING AND INSTALLING .

-- Install the exhaust system without tension. Refer to EXHAUST SYSTEM, INSTALLING WITHOUT TENSION .

-- Fill the coolant. Refer to Filling .

-- Check the oil level.

NOTE:

After installing the turbocharger, let the engine run at idle for approximately one minute and without increasing the engine speed. This ensures the turbocharger is supplied with oil.