Overview - Hood
- Hood
- Removing and Installing. Refer to HOOD, REMOVING AND INSTALLING .
- Adjusting. Refer to HOOD, ADJUSTING .
- Side Seal
- Right and left
- Insulation
- Removing and Installing. Refer to INSULATION, REMOVING AND INSTALLING .
- Adjusting Buffer
- There is always a protective film on the adjusting buffer support point
- Quantity: 2
- Center Seal
- Striker
- Removing and Installing. Refer to STRIKER, REMOVING AND INSTALLING .
- Hex Nut
- 12 Nm
- Quantity: 3
- Hex Nut
- 22 Nm
- For attaching the hood
- Quantity: 2 on each side
- Hinge
- Removing and Installing. Refer to HINGES, REMOVING AND INSTALLING .
- Bolt
- 22 Nm
- For attaching the hinge
- Quantity: 2 on each side
- Bolt
- 12 Nm
- Self-locking, after each removal the bolt must be replaced
- Quantity: 2
- Latch
- Removing and Installing. Refer to LATCH, REMOVING AND INSTALLING .
- Gas-Filled Strut
- Removing and Installing. Refer to GAS-FILLED STRUT, REMOVING AND INSTALLING .
- Venting. Refer to GAS-FILLED STRUT, VENTING .