LEMON Manuals: Even more car manuals for everyone
Home >> Volkswagen >> 2018 >> Beetle S, 2D Hatchback >> Repair and Diagnosis >> External Pages >> Different car >> Section 68 (2.5L - Cooling System - Engine Code(S): CBTA & CBUA (Convertible)) >> 19 Cooling System >> General Information >> Coolant, Draining And Filling >> Coolant Mixture Ratio

Coolant Mixture Ratio

WARNING: This page is about a different car, the 2014 Volkswagen Beetle and 2013 Volkswagen Beetle. However, it is still accessible from the selected car via links, so may be relevant.
Frost Protection to Portion of Coolant Additive Coolant Additive (1) Distilled Water(1)
-25°C -25°C (-13°F) -36°C -36°C (-32.8°F) 40% 50% 3.2L 4.0L 4.8L 4.0L
(1) The amount of coolant may vary depending on vehicle equipment.

-- Connect the coolant hose -2- to the radiator and secure it with a spring clamp -1-.

Fig 1: Identifying Spring Clamp And Coolant Hose
GWWM19-10004Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

-- Fill Cooling System Charge Kit - Reservoir VAS 6096/1 on the Cooling System Charge Kit VAS 6096 with at least 10 liters of pre-mixed coolant.

Fig 2: Filling Coolant Reservoir Of Cooling System Charge Unit VAS 6096
GWWA19-0351Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

-- Use the proper mixture ratio of coolant.

-- Attach the Adapter V.A.G 1274/8 to the coolant reservoir.

-- Remove the Cooling System Charge Unit VAS 6096 on the Adapter V.A.G 1274/8.

-- Place the air outlet hose -1- in a small container -2-.

NOTE: A small amount of coolant which should be collected is drawn off with the discharged air.

-- Close valves -A and B- by turning lever at a right angle to direction of flow.

-- Connect the hose -3- to compressed air.

-- Open valve -B- by turning level in direction of flow.

Fig 3: Cooling System, Draining And Filling
GWWA19-0353Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

-- Open the valve -A- slightly for a moment.

-- To do this, turn the lever in the direction of flow so that the Coolant System Filler Unit Replacement Reservoir VAS 6096/1 hose fills with coolant.

-- Close valve -A- again.

-- Leave valve -B- open another two minutes.

-- Close valve -B-.

NOTE:

Repeat the procedure if the needle goes below the green range.

Check the cooling system for leak if the pressure drops.

-- Remove pressurized air hose.

-- Open valve -A-.

-- Remove the Cooling System Charge Unit VAS 6096 from the coolant reservoir.

-- Fill up the coolant reservoir -1- with coolant to the "max" marking -arrow-.

Fig 4: Identifying Coolant Reservoir
GWWN19-10813Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

-- Install the noise insulation. Refer to REMOVAL AND INSTALLATION .

-- If the vehicle has a parking heater, switch it on for about 30 seconds.

-- Set the temperature at "HI".

-- Press AC  to turn off the Air Conditioning (A/C) compressor.

-- Start the engine and run it at approximately 1500 RPM for a maximum of two minutes.

-- With engine running, fill coolant up to overflow hole on coolant expansion tank.

-- Close the cap on the coolant reservoir until it locks into place.

-- Allow engine to run at idle until both large coolant hoses on the radiator are warm.

-- Turn off engine and allow it to cool off.

-- Check the coolant level in the coolant reservoir -1-.

Fig 5: Identifying Coolant Reservoir
GWWN19-10813Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

-- Add more coolant if necessary.