Tightening Specifications
| Component | Nm | |||||
|---|---|---|---|---|---|---|
| Turbocharger to the cylinder head nuts1, 2 | Follow the tightening sequence, refer to Figure. | |||||
| Oil supply pipe to turbocharger (M12) banjo bolt | 33 | |||||
| Oil return pipe to turbocharger bolt | 9 | |||||
| Coolant supply pipe to turbocharger (M14) banjo bolt (Tighten using the Bits for VAG 1331/13 T10099) | 38 | |||||
| Turbocharger bracket to cylinder block bolt(2) | 30 | |||||
| Turbocharger bracket to turbocharger bolt(2) | 30 | |||||
| Right charge air pipe to oil pan bolt | 10 | |||||
| Heat shield to cylinder head (M8 and M12) bolts | 20 | |||||
|
||||||