Turbocharger, Removing And Installing: Installing
Install In Reverse Order Of Removal And Note The Following:
Replace seals, gaskets, O-rings and self-locking nuts.
Coat the stud bolts on the turbocharger with hot bolt paste; hot bolt paste. Refer to the Parts Information.
Fill the turbocharger with engine oil at the connection for oil supply line.
Hose connections and charge air system hoses must be free of oil and grease before installing.
Secure hose connections with standard production clamps. Refer to the Parts Information.
-- Install the front exhaust pipe with the catalytic converter. Refer to CATALYTIC CONVERTER, REMOVING AND INSTALLING .
-- Install the exhaust system without tension. Refer to EXHAUST SYSTEM, INSTALLING WITHOUT TENSION .
-- Fill with coolant. Refer to Filling .
-- Check the oil level.
After installing turbocharger, let engine idle for approximately 1 minute without increasing engine speed. This ensures adequate oil supply to the turbocharger.