Balance Shaft Timing Chain: Installing
- Tightening specifications, refer to BALANCE SHAFT TIMING CHAIN OVERVIEW .
-- Rotate the intermediate shaft sprocket/balance shaft to the mark -arrow-.
The painted links on the timing chain must be positioned on the marks on the chain sprockets.
Due to the ratio, the marks align only after every 7th turn.
-- Install the timing chain; the painted links on the timing chain must be positioned on the marks on the chain sprockets.
-- Install the timing chain tensioning rail and tighten the guide pins -2-.
-- Install the timing chain guide rail and tighten the guide pins -4-.
-- Install the timing chain guide rail and tighten the guide pins -3-.
-- Install the timing chain tensioner -1- using locking fluid.
-- Check this adjustment one more time.
-- Check the marks on the intermediate shaft sprocket/balance shaft -arrow-.
The mark on the intermediate shaft sprocket/balance shaft is shown with the chain removed.
Further installation is in the reverse order of removal.