Engine And Transmission, Separating And Assembling

Special Tools And Workshop Equipment Required 

Conditions: 

Separating 

-- Remove the starter. Refer to Removal and Installation .

Vehicles with a Direct Shift Gearbox (DSG): 

-- Remove the coolant hoses from the transmission oil cooler and seal off the openings.

Continuation for all Vehicles: 

-- Disconnect all electrical connections from the transmission to the engine and free them up.

-- Install the Shackle 10-222 A/12 to the transmission and install the shop crane-load cap = 700-1200 KG VAS 6100 to the shackle, but do not lift yet.

Fig 1: Converter Secured From Falling Out Using A Wire
GWWN37-10122Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

-- Remove the upper engine/transmission bolts.

-- Before removing the last bolts, support the transmission with the shop crane.

-- Remove the lower engine/transmission bolts.

-- Separate the transmission from the engine; when doing this, guide the transmission.

Assembling 

Assembly is performed in reverse order of removal; pay attention to the tightening specifications. Refer to the following: