LEMON Manuals: Even more car manuals for everyone
Home >> Volkswagen >> 2009 >> GLI 2.0 J, Standard >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> 2.0L - Turbocharger, Supercharger - Engine Code(S): CBFA & CCTA (Sedan) (A5 Platform) >> 21 Turbocharger, Supercharger >> Specifications >> Fastener Tightening Specifications

Fastener Tightening Specifications

Component Fastener Size Nm
Charge Air Cooler Mount Bolt - 5
Charge Air Pipe to Cylinder Block - 10
Charge Air Pressure Sensor to Charge Air Pipe Bolt - 5
Charge Air Regulation Vacuum Diaphragm to Turbocharger Bolt - 10
Charge Air System Noise Generator Bracket Nut (3) - 8
Charge Air System Noise Generator to Bracket Bolt (3) - 8
Connection to Turbocharger Bolt - 9
Coolant Return Line Bracket to Turbocharger Bolt - 9
Coolant Return Line to Turbocharger Banjo Bolt - 38
Coolant Supply Line Bracket to Cylinder Block Bolt - 9
Coolant Supply Line to Cylinder Block Banjo Bolt - 38
Coolant Supply Line to Turbocharger Banjo Bolt - 38
Fastening Strip Nut (1) - 30
Oil Return Line to Cylinder Block Bolt - 9
Oil Return Line to Turbocharger Bolt - 9
Oil Supply Line Bracket to Turbocharger Bolt - 9
Oil Supply Line to Cylinder Block Bolt - 9
Oil Supply Line to Turbocharger Banjo Bolt - 33
Plenum Chamber Bulkhead Bolt - 8
Structure Borne Sound Actuator to Bracket Nut (3) - 15
Structure Borne Sound Actuator Bracket to Plenum Chamber Bolt (3) - 8
Structure Borne Sound Control Module to Bracket Bolt (3) - 8
Structure Borne Sound Control Module Bracket to Plenum Chamber Nut (3) - 8
Turbocharger Recirculation Valve to Turbocharger Bolt - 7
Turbocharger Support to Cylinder Block Bolt (2) - 30
Turbocharger Support to Turbocharger Bolt (2) - 30
Wastegate Bypass Regulator Valve to Turbocharger Bolt - 3
(1) Always replace
(2) Lubricate the bolts with hot bolt paste
(3) Jetta/GLI for MY 08 through 10, Jetta SportWagen (US)/Jetta Wagon (Canada) for MY 09 only

Turbocharger Nut Tightening Sequence and Specification 

Fig 1: Identifying Turbocharger Tightening Sequence
GWWA21-10341Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

Tighten the nuts in 4 passes in sequence -1 through 5- as follows:

-- Tighten the nuts to 5 Nm.

-- Tighten the nuts to 12 Nm.

-- Tighten the nuts to 16 Nm.

-- Tighten the nuts to 25 Nm.