Thermostat, Removing And Installing: Installing
Installation is performed in the reverse sequence. Note the following:
- Moisten new O-ring -2- with coolant.
- Install union -3- with thermostat -1- into engine block.NOTE: The brace on the thermostat must be almost vertical.
- Tighten securing bolts -4-. Tightening torque: 15 Nm
- Fill with coolant. See Filling .