Cylinder Head Cover
Special tools and workshop equipment required
- Torque Wrench (5-50 Nm) V.A.G 1331
- Hose Clip Pliers VAS 6362
- Socket T40055
- Ratchet, Reversible V.A.G 1331/1
- Engine Bung Set VAS 6122
- Follow the safety precautions when working on the diesel direct injection system. Refer to SAFETY PRECAUTIONS .
- Observe rules for cleanliness. Refer to CLEAN WORKING CONDITIONS .
Always follow these instructions before and during work.
Cylinder head cover overview. Refer to CYLINDER HEAD COVER OVERVIEW .
Removing
When doing any repair work, especially in the engine compartment, pay attention to the following due to clearance issues:
- Route all lines and wires in their original locations.
- For example, fuel, hydraulic, Evaporative Emission (EVAP), coolant, refrigerant, brake fluid and vacuum lines.
- Ensure sufficient clearance to all moving or hot components.
-- Remove the engine cover. Refer to ENGINE COVER .
-- Remove the protective strip.
-- Disconnect the connectors from the fuel injectors -A-, the exhaust pressure sensor 1 -G450- -B- and the fuel pressure sensor -G247- -C-.
-- Remove the coolant line bolts -arrows- from the intake manifold and lay the line in front of the intake manifold.
-- Unclip the wiring harness for the glow plugs from the wiring guide.
Always follow the procedure "glow plug connectors, disconnecting and installing".
-- Disconnect the glow plug connectors. Refer to GLOW PLUG CONNECTOR, DISCONNECTING AND CONNECTING .
-- Remove the fuel return line bolt from the intake manifold.
-- Reposition the hose clamp -arrow- using hose clip pliers VAS 6362 and remove the line from the fuel rail.
-- Before removing, clean the return line connection on the fuel injectors (for example using a commercially available detergent).
-- Cover the return line connections with a cloth.
-- Remove the fuel return line connections on the fuel injectors. Pull them upward to release them -arrow-.
Follow the rules of cleanliness.
Do not let any dirt to get into the disconnected return lines or into the connections for the fuel injection units.
-- Reposition the hose clamp using hose clip pliers VAS 6362 and remove the fuel return line.
-- Reposition the hose clamp -4- using hose clip pliers VAS 6362 and remove the fuel return line at the high pressure fuel pump.
-- Seal the lines so that the fuel system is not contaminated by dirt, etc.
-- Remove the fuel return line and lay the lines in front of the intake manifold.
-- Disconnect the connector from the charge pressure actuator position sensor -G581- -arrow- at the turbocharger vacuum diaphragm and guide the line out of the retainers.
-- Disconnect the connector from the fuel pressure regulator valve -N276- -arrow-.
-- Remove the line guide on the fuel rail and lay it aside.
-- Remove the vacuum hose from the cylinder head cover.
-- Remove the remaining vacuum hoses from the bracket on the cylinder head cover.
-- Disconnect the connector -1- from the engine coolant temperature sensor on radiator outlet -G83-, open the clips -arrows- and remove the upper toothed belt guard.
-- Remove the crankcase ventilation hose between the intake tube and the cylinder head cover.
The crankcase ventilation hose is destroyed when it is removed.
-- Remove the high pressure fuel line between the high pressure fuel pump and fuel rail.
-- Remove the high pressure fuel lines between the fuel rail and fuel injectors.
-- Remove the bolts -arrows- and the fuel rail.
-- Remove the fuel injectors. Refer to FUEL INJECTOR .
-- Remove the cylinder head cover bolts in sequence -7 through 1-.
-- Remove the cylinder head cover.
Installing
Install in reverse order of removal. When doing this note the following:
- Replace the cylinder head cover gasket if it leaks or is damaged.
- When installing the high pressure line or fuel lines, make sure no dirt or contaminants enter the fuel system.
- Only remove the sealing plugs right before installing the fuel lines.
- Do not change the angles of the high pressure lines
- Make sure line connections are securely fastened.
- Do not swap the supply and return lines.
-- First, tighten the cylinder head cover bolts by hand in sequence -1 through 7-.
-- Tighten the cylinder head cover bolts in sequence -1 through 7- to specification.
- Tightening specification, see -item 14- in the CYLINDER HEAD COVER OVERVIEW .
-- Install the upper toothed belt guard.
-- Make sure the upper toothed belt guard is clipped to the cylinder head cover correctly.
The camshaft gear is not shown in the illustration.
-- Press the upper toothed belt guard in the area with the clips -arrows- against the cylinder head cover until the clips engage with each other. Use a screwdriver to press the guard if necessary.
-- Check the clearance between the hub and the upper toothed belt guard.
-- Tighten the high pressure line union nuts by hand.
-- Make sure the high pressure line is free of tension.
-- Use the torque wrench (5-50 Nm) V.A.G 1331 with the ratchet, reversible V.A.G 1331/1 and the socket T40055 to tighten the high pressure line.
Tightening Specifications
- Cylinder head cover overview, refer to CYLINDER HEAD COVER OVERVIEW .
- Fuel system overview, refer to FUEL RAIL AND INJECTORS OVERVIEW .
-- Fill the fuel system, refer to FUEL SYSTEM, FILLING AND BLEEDING .