LEMON Manuals: Even more car manuals for everyone
Home >> Volkswagen >> 2002 >> GTI Base, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 148 (2.0L - Cylinder Head, VALVETRAIN - Engine Code(S): CBFA & CCTA (Sedan) (A5 Platform)) >> 15 Cylinder Head, VALVETRAIN >> Specifications >> Fastener Tightening Specifications

Fastener Tightening Specifications

WARNING: This page is about a different car, the 2010 Volkswagen Jetta, 2009 Volkswagen Jetta, 2009 Volkswagen GLI, 2008 Volkswagen Jetta, and 2008 Volkswagen GLI. However, it is still accessible from the selected car via links, so may be relevant.
Component Fastener Size Nm
Balance Shaft to Cylinder Block Bolt - 9
Balance Shaft Chain Tensioner to Cylinder Block (4) - 65
Balance Shaft Timing Chain Guide Rail to Cylinder Block Guide Pin - 20
Balance Shaft Timing Chain Tensioning Rail to Cylinder Block Guide Pin - 20
Bearing Bracket to Cylinder Head Bolt - 9
Bearing Bracket to Exhaust Camshaft Bolt (1)
  M6 8 + 90°
M8 20 + 90°
Camshaft Position Sensor to Cylinder Head Bolt - 9
Camshaft Timing Chain Guide Rail to Cylinder Block Guide Pin - 20
Camshaft Timing Chain Tensioner to Cylinder Block Bolt - 9
Camshaft Timing Chain Tensioning Rail to Cylinder Block Guide Pin - 20
Control Valve to Intake Camshaft (2) - 35
Heat Shield to Bracket Bolt - 9
Heat Shield to Bracket/Cylinder Head Bolt - 20
Oil Dipstick Guide Tube/Camshaft Adjustment Valve 1 to Cylinder Head Bolt - 9
Oil Dipstick Guide Tube to Cylinder Head Bolt - 9
Plug with Ball Head Stud to Cylinder Head Cover - 5
Retaining Plate/Connecting Piece to Cylinder Head Bolt - 9
Secondary Air Injection Solenoid Valve to Cylinder Head Bolt (3) - 9
Transport Strap to Cylinder Head Bolt - 25
(1) Always replace
(2) Has left hand threads
(3) Engine code CBFA only
(4) Install with locking fluid

Crankcase Ventilation Bolt Tightening Sequence and Specification 

Fig 1: Identifying Crankcase Ventilation - Tightening Sequence
GWWA15-10605Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

Tighten the crankcase ventilation bolts in sequence -1 through 10- to 11 Nm.

Cylinder Head Cover Bolt Tightening Sequence and Specification

Fig 2: Identifying Cylinder Head Cover - Tightening Sequence
GWWA15-10431Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

Tighten the new cylinder head cover bolts in 3 passes in sequence -1 through 6- as follows:

-- 1. Tighten the bolts by hand.

-- 2. Tighten the bolts to 8 Nm.

-- 3. Tighten the bolts an additional 90° (1/4) turn.

Cylinder Head, Bolt Tightening Sequence and Specification

Fig 3: Identifying Cylinder Head - Tightening Sequence
GWWA15-10475Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

Tighten the new cylinder head bolts in 3 passes in sequence -1 through 5- as follows:

-- 1. Tighten the bolts to 40 Nm.

-- 2. Tighten the bolts an additional 90° (1/4) turn.

-- 3. Tighten the bolts an additional 90° (1/4) turn.

-- 4. Tighten the new bolts -arrows- to 8 Nm.

-- 5. Tighten the bolts -arrows- an additional 90° (1/4) turn.

Upper Timing Chain Cover Bolt Tightening Sequence and Specification

Fig 4: Identifying Upper Timing Chain Cover - Tightening Sequence
GWWA15-10430Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

Tighten bolts in 2 passes in sequence -1 through 5- as follows:

-- 1. Tighten the bolts by hand.

-- 2. Tighten the bolts to 9 Nm.

Lower Timing Chain Cover Bolt Tightening Sequence and Specification

Fig 5: Identifying Lower Timing Chain Cover Bolts
GWWN15-10474Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

Tighten the bolts in 3 passes in sequence -1 through 15- as follows:

-- 1. Tighten the bolts by hand.

-- 2. Tighten the bolts to 8 Nm.

-- 3. Tighten the bolts an additional 90° (1/4) turn.

Intermediate Shaft Sprocket Bolt Tightening Specification

Fig 6: Identifying Intermediate Shaft Sprocket
GWWA15-10464Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

Tighten the bolt in 4 passes as follows:

-- 1. Tighten the bolt to 10 Nm.

-- 2. Turn the sprocket.

The sprocket must not have any play; if so, loosen and tighten again.

-- 3. Tighten the bolt to 30 Nm.

-- 4. Tighten the bolt an additional 90° (1/4) turn.