Work sequence
WARNING: This page is about a different variant/trim than selected.
- Remove sound insulation: Refer to NOISE INSULATION (GASOLINE ENGINES), ASSEMBLY OVERVIEW or NOISE INSULATION (DIESEL ENGINES), ASSEMBLY OVERVIEW
- Pull vacuum hose off combination valve on Secondary Air Injection (AIR) Solenoid Valve N112
Location: Refer to FUEL INJECTION, SERVICING
- Connect Manual vacuum pump VAG 1390 on vacuum hose to combination valve.
NOTE:
- Do not use compressed air in the following test!
- Remove intake hose to combination valve on top of air filter - arrow - and blow in with low pressure.
Combination valve must be closed.
- Start hand pump.
Combination valve should open.
If the combination valve does not open:
- Replace combination valve, refer to Combination valve, removing and installing .