Work sequence
WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2005 Volkswagen GTI, 2004 Volkswagen Jetta, 2004 Volkswagen GTI, 2003 Volkswagen Jetta, and 2003 Volkswagen GTI. However, it is still accessible from the selected car via links, so may be relevant.
- Install lower coolant hose and secure with retaining clamp - arrow -.
- Slide coolant hoses onto oil cooler unions - arrows - and secure with spring-type clamps.
- Install center insulation tray: → 50 BODY, FRONT
Without using coolant system charging unit VAS 6096
- Fill coolant slowly up to top mark of hatched field on expansion tank.
Using coolant system charging unit VAS 6096
- Screw adapter VAG 1274/8 onto expansion tank.
- Fill coolant system using coolant system charging unit VAS 6096 : → Electrical Wiring Diagrams, Troubleshooting and Component Locations
With and without coolant system charging unit VAS 6096
- Seal expansion tank.
- Switch off heater and air conditioner.
- Start engine and maintain an engine speed of about 2000 rpm for approx. 3 minutes.
- Allow engine to run at idling speed until lower hose on radiator becomes hot.
- Switch ignition off.
- Check coolant level and top up coolant if necessary: At normal engine operating temperature coolant level must reach top mark of hatched field. When engine is cold coolant level should be around middle of hatched field.