Work sequence
WARNING: This page is about a different variant/trim than selected.
- Disconnect brown 2-pin connector from needle lift sensor - arrow -.
- Measure resistance between connector terminals.
- Specification: 80.0 to 120.0 Ω
If specification is not obtained:
- Replace No. 3 cylinder injector together with Needle Lift Sensor G80.
- Check DTC memory and, if necessary, repair any malfunctions and then erase → Diagnostic Trouble Code (DTC) memory, checking and erasing .
- Read readiness code → Readiness code, displaying .
If DTC memory has been erased, the readiness code must be generated again → Readiness code, setting .
If specification is obtained:
- Remove wiper arms and plenum cover. →92 WINDSHIELD WIPER & WASHER SYSTEM
- Connect test box V.A.G 1598/22 (through my 1999) or test box V.A.G 1598/31 (from my 2000) to control module wiring harness.
- Check wiring between test box and connector for open circuit according to wiring diagram.
| Test box socket no. | ||
| Terminal | Through MY 1999 | From MY 2000 |
| 1 | 62 | 109 |
| 2 | 55 | 101 |
- Wire resistance: max. 1.5 Ω
- Check wires for short to one another, to vehicle Ground (GND) and to battery positive (B+).
- Specification: ∞ Ω
- If wiring and resistance measurement values are OK, replace engine control module → Diesel Direct Fuel Injection (DFI) Engine Control Module (ECM) J248 , replacing .