Home >> Volkswagen >> 2000 >> Jetta GLX, Automatic >> Repair and Diagnosis >> External Pages >> Different car >> Section 166 (2.0L - Engine Assembly - Engine Code(S): CBFA & CCTA (Sedan) (A5 Platform)) >> 10 Engine Assembly >> Removal And Installation >> Engine And Transmission, Separating And Assembling

Engine And Transmission, Separating And Assembling

WARNING: This page is about a different car, the 2010 Volkswagen Jetta, 2009 Volkswagen Jetta, 2009 Volkswagen GLI, 2008 Volkswagen Jetta, and 2008 Volkswagen GLI. However, it is still accessible from the selected car via links, so may be relevant.

Special Tools And Workshop Equipment Required 

Conditions: 

Separating 

-- Remove the starter. Refer to Removal and Installation .

Vehicles with a Direct Shift Gearbox (DSG): 

-- Remove the coolant hoses from the transmission oil cooler and seal off the openings.

Continuation for all Vehicles: 

-- Disconnect all electrical connections from the transmission to the engine and free them up.

-- Install the Shackle 10-222 A/12 to the transmission and install the shop crane-load cap = 700-1200 KG VAS 6100 to the shackle, but do not lift yet.

Fig 1: Converter Secured From Falling Out Using A Wire
GWWN37-10122Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

-- Remove the upper engine/transmission bolts.

-- Before removing the last bolts, support the transmission with the shop crane.

-- Remove the lower engine/transmission bolts.

-- Separate the transmission from the engine; when doing this, guide the transmission.

Assembling 

Assembly is performed in reverse order of removal; pay attention to the tightening specifications. Refer to the following: