Pull rod, adjusting
NOTE:
Pull rod must be adjusted each time it is removed and installed or when repairs are performed.
- Secure locking link: Insert 3.2 mm dia. (0.125 in.) drill -1- into lock hole.
- Draw pull rod in direction of arrow against resistance of drill.
- Press pull rod in and close hinged sleeve.
- Pull drill out of lock.
- Perform functional check.
- Locking link must spring back to end position.