Toothed belt, removing and installing (engine code AAZ 09.94 and up): Removing
WARNING: This page is about a different car, the 1999 Volkswagen Jetta, 1998 Volkswagen Jetta, 1997 Volkswagen Jetta, 1996 Volkswagen Passat, and 1996 Volkswagen Jetta. However, it is still accessible from the selected car via links, so may be relevant.
- Removing ribbed belt.
- If installed, remove ribbed belt tensioning roller.
- Remove upper toothed belt guard and cylinder head cover.
- Turn crankshaft to TDC for number 1 cylinder (arrow).
- Lock camshaft using 2065A setting bar.
- Center 2065A setting bar by turning camshaft so that one side of setting bar contacts cylinder head.
- Measure gap between other end of setting bar and cylinder head using feeler gauge.
- Divide that measurement in half and place feeler gauge corresponding to half measurement between setting bar and cylinder head.
- Turn camshaft until setting bar contacts feeler gauge, then place 2nd feeler gauge (of same 1/2 measurement) on opposite side between setting bar and cylinder head.
- Lock injection pump sprocket using pin.
- Loosen tensioner.
- Remove vibration damper and belt pulley.
- Remove lower toothed belt guard.
- Mark toothed belt running direction.