Installation [06/2020 - 10/2022]: Procedure
- INSTALL METER MIRROR SUB-ASSEMBLY
- INSTALL INSTRUMENT PANEL SAFETY PAD ASSEMBLY
Refer to INSTALLATION [06/2020 - 10/2022]
- INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL
Refer to WORK PROCEDURE [06/2020 - 10/2022]
HINT:
When disconnecting and reconnecting the auxiliary battery, there is an automatic learning function that completes learning when the respective system is used.
Refer to AUTOMATIC LEARNING CHART [06/2020 - 12/2021] , or refer to AUTOMATIC LEARNING CHART [12/2021 - ]
- CHECK SRS WARNING LIGHT
Refer to OPERATION CHECK [06/2020 - ]
- PERFORM DIAGNOSTIC SYSTEM CHECK
Refer to DTC CHECK / CLEAR [06/2020 - ]