Removal [06/2020 - ]: Procedure
- DRAIN ENGINE COOLANT
Refer to PROCEDURE - Step 1
- REMOVE NO. 1 ENGINE COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 23 [06/2020 - 12/2021] , or refer to PROCEDURE - Step 23 [12/2021 - 10/2022] , or refer to PROCEDURE - Step 23 [10/2022 - ]
- REMOVE INLET AIR CLEANER ASSEMBLY
- REMOVE AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
- Disconnect the mass air flow meter sub-assembly connector.
- Detach the wire harness clamp.
- Slide the clip and disconnect the No. 2 PCV hose from the cylinder head cover sub-assembly.
*a Grommet *b Pin - Loosen the hose clamp and disconnect the air cleaner hose from the throttle body with motor assembly.
- Detach the 2 grommets and pin to remove the air cleaner assembly with air cleaner hose.
- Disconnect the mass air flow meter sub-assembly connector.
- REMOVE THROTTLE BODY WITH MOTOR ASSEMBLY
- Disconnect the throttle body with motor assembly connector.
- Slide the clip and disconnect the No. 5 water by-pass hose from the throttle body with motor assembly.
- Remove the 3 bolts and disconnect the throttle body with motor assembly from the intake manifold.
- Slide the clip and disconnect the No. 6 water by-pass hose to remove the throttle body with motor assembly.NOTE:
If the throttle body with motor assembly has been struck or dropped, replace it.
- Remove the throttle body gasket from the intake manifold.
- Disconnect the throttle body with motor assembly connector.