Air Conditioning Amplifier Communication Stop Mode [12/2022 - ]: Procedure
WARNING: This page is about a different variant/trim than selected.
- CHECK FOR OPEN IN CAN BUS LINES (AIR CONDITIONING AMPLIFIER ASSEMBLY BRANCH LINE)
- Disconnect the cable from the negative (-) auxiliary battery terminal.
- Disconnect the K74 air conditioning amplifier assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition K74-2 (CANH) - K74-1 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 54 to 69 Ω Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE CAN BRANCH LINES OR CONNECTOR (AIR CONDITIONING AMPLIFIER ASSEMBLY)
Result:
OK
See step 2
- CHECK HARNESS AND CONNECTOR (POWER SOURCE CIRCUIT)
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition K74-17 (GND) - Body ground Cable disconnected from negative (-) auxiliary battery terminal Below 1 Ω - Reconnect the cable to the negative (-) auxiliary battery terminal.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition K74-5 (B) - Body ground Ignition switch off 11 to 14 V K74-6 (IG+) - Body ground Ignition switch ON 11 to 14 V Result
Proceed to OK NG
Result:
OK
REPLACE AIR CONDITIONING AMPLIFIER ASSEMBLY
Refer to REMOVAL [12/2022 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (POWER SOURCE CIRCUIT)
- Measure the resistance according to the value(s) in the table below.