Installation [11/2021 - ]: Procedure
- INSTALL LIGHT CONTROL RHEOSTAT
- INSTALL INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY
- INSTALL INSTRUMENT SIDE PANEL LH
Refer to PROCEDURE - Step 36 - CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 5 - INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
Refer to WORK PROCEDURE [11/2021 - ]
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.