Installation [02/2024 - ]: Procedure
- INSTALL FRONT ENGINE MOUNTING INSULATOR RH
Refer to PROCEDURE - Step 1
- INSTALL FRONT ENGINE MOUNTING INSULATOR LH
Refer to PROCEDURE - Step 2
- INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
- INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
- INSTALL ENGINE WIRE
- INSTALL ENGINE HANGER
See step 40 - INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- INSTALL COMPRESSOR WITH MOTOR ASSEMBLY
Refer to PROCEDURE - Step 2 - INSTALL FUEL PUMP PROTECTOR
Refer to PROCEDURE - Step 9
- INSTALL FUEL HOSE PROTECTOR
Refer to PROCEDURE - Step 11
- INSTALL PCV PRESSURE SENSOR CHAMBER
Refer to PROCEDURE - Step 12 - INSTALL VACUUM SENSOR ASSEMBLY
Refer to PROCEDURE - Step 1
- REMOVE ENGINE STAND
- INSTALL ENGINE ASSEMBLY
- INSTALL VENTILATION HOSE
- INSTALL NO. 2 VENTILATION HOSE
- REMOVE ENGINE HANGER
- INSTALL HOSE VACUUM HEAT INSULATOR
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
- INSTALL MOTOR CABLE
- INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE
See step 2 - INSTALL FLYWHEEL SUB-ASSEMBLY
See step 3 - INSTALL HYBRID VEHICLE TRANSMISSION ASSEMBLY WITH TRANSFER ASSEMBLY
Refer to INSTALLATION [02/2024 - ]
- CONNECT FUEL TUBE SUB-ASSEMBLY
- Connect the fuel tube sub-assembly.
Refer to PRECAUTION [02/2024 - ]
- Install the EFI fuel pipe clamp (fuel tube sub-assembly side) to the fuel tube connector.
- Connect the fuel tube sub-assembly.
- CONNECT SUCTION HOSE
Refer to PROCEDURE - Step 4 - CONNECT NO. 1 COOLER REFRIGERANT DISCHARGE HOSE
Refer to PROCEDURE - Step 5 - INSTALL WATER PUMP AND CRANKSHAFT PULLEY V BELT
Refer to INSTALLATION [02/2024 - ] - CONNECT HEATER RETURN HOSE CONNECTOR
- CONNECT WATER HOSE SUB-ASSEMBLY B
- CONNECT FUEL VAPOR FEED HOSE ASSEMBLY
- INSTALL UPPER ARM BUSH INSULATOR
Torque: 26 N.m (265 kgf/cm, 19 ft.lbf)
- INSTALL INVERTER COOLING PIPE ASSEMBLY
Torque: 12 N.m (122 kgf/cm, 9 ft.lbf)
- INSTALL TURBOCHARGER SUB-ASSEMBLY
Refer to INSTALLATION [02/2024 - ]
- CONNECT ENGINE WIRE
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Refer to PROCEDURE - Step 17
- INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
Refer to PROCEDURE - Step 18
- INSTALL AIR CLEANER CAP WITH NO. 1 AIR CLEANER HOSE
Refer to PROCEDURE - Step 19
- INSTALL FRONT CROSS MEMBER
Torque: 88 N.m (897 kgf/cm, 65 ft.lbf)
- INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY
Refer to INSTALLATION [02/2024 - ]
- INSTALL HOOD SUB-ASSEMBLY WARNING:
Be sure to perform this procedure with several people as the hood sub-assembly is very heavy.
- ADJUST HOOD SUB-ASSEMBLY
Refer to ADJUSTMENT [02/2024 - ]
- INSTALL RADIATOR ASSEMBLY
Refer to INSTALLATION [02/2024 - ]
- INSTALL FRONT FENDER APRON TRIM PACKING D
- INSTALL FRONT FENDER APRON TRIM PACKING C
- INSTALL FRONT FENDER APRON TRIM PACKING B
- INSTALL FRONT FENDER APRON TRIM PACKING A
- INSTALL FRONT WHEEL
Refer to INSTALLATION [02/2024 - ]
- INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
Torque: 29 N.m (296 kgf/cm, 21 ft.lbf)
- INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
Torque: 29 N.m (296 kgf/cm, 21 ft.lbf)
- INSTALL FRONT BUMPER GUARD BASE COVER
Torque: 7.5 N.m (76 kgf/cm, 66 in.lbf)
- INSTALL FRONT BUMPER ASSEMBLY
Refer to INSTALLATION [02/2024 - ]
- CONNECT NEGATIVE AUXILIARY BATTERY TERMINAL
Refer to INSTALLATION [02/2024 - ]
- INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.
- ADD ENGINE OIL
Refer to PROCEDURE - Step 7
- ADD AND ADJUST TRANSMISSION FLUID
Refer to REPLACEMENT [02/2024 - ]
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 4
- ADD COOLANT (for Inverter)
- for Active Test:
Refer to PROCEDURE - Step 2
- for Inspection Mode:
Refer to PROCEDURE - Step 3
- for Active Test:
- CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT
Refer to PROCEDURE - Step 3
- WARM UP COMPRESSOR
Refer to PROCEDURE - Step 4
- INSPECT FOR ENGINE OIL LEAK
Refer to PROCEDURE - Step 8
- WARM UP ENGINE
- INSPECT FOR COOLANT LEAK (for Engine)
Refer to PROCEDURE - Step 1
- INSPECT FOR COOLANT LEAK (for Inverter)
Refer to PROCEDURE - Step 1
- INSPECT FOR REFRIGERANT LEAK
- INSPECT FOR FUEL LEAK
Refer to PROCEDURE - Step 1
- INSPECT FOR EXHAUST GAS LEAK
Refer to PROCEDURE - Step 4
- CHECK ENGINE OIL LEVEL
Refer to PROCEDURE - Step 1
- INSPECT ENGINE COOLANT LEVEL IN RESERVOIR TANK (for Engine)
Refer to PROCEDURE - Step 2
- INSPECT IGNITION TIMING
See step 9
- INSPECT ENGINE IDLE SPEED
See step 10
- INSPECT CO/HC
See step 12