Installation [02/2024 - ]: Procedure
- INSTALL PURGE VSV (DUTY VACUUM SWITCHING VALVE)
*1 No. 1 Fuel Vapor Feed Hose *2 No. 2 Fuel Vapor Feed Hose *3 Fuel Vapor Feed Hose Assembly - - *a Paint Mark *b 45° *c 60° *d 2.0 to 7.0 mm (0.0787 to 0.2756 in.) *e Upper Side - - Install in this Direction - - - Install the purge VSV (duty vacuum switching valve).
- Connect the No. 1 fuel vapor feed hose to the purge VSV (duty vacuum switching valve) and slide the hose clip to secure it.NOTE:
Align the hose and the hose clip at the locations shown in the illustration and install them.
- Connect the fuel vapor feed hose assembly to the purge VSV (duty vacuum switching valve) and slide the hose clip to secure it.NOTE:
- Make sure that the tabs of the clip are within the area shown in the illustration.
- Align the hose and the hose clip at the locations shown in the illustration and install them.
- Connect the No. 2 fuel vapor feed hose and connector to the purge VSV (duty vacuum switching valve).