Installation [11/2021 - ]: Procedure
- INSTALL TRIP SWITCH
- INSTALL UPPER INSTRUMENT PANEL METER ORNAMENT
Refer to PROCEDURE - Step 22 - INSTALL NO. 2 INSTRUMENT PANEL REGISTER SUB-ASSEMBLY
- INSTALL CENTER INSTRUMENT PANEL REGISTER ASSEMBLY
- INSTALL METER HOOD SUB-ASSEMBLY
- INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
- INSTALL INSTRUMENT PANEL ORNAMENT
- INSTALL INSTRUMENT SIDE PANEL RH
Refer to PROCEDURE - Step 34 - INSTALL INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY
- INSTALL INSTRUMENT SIDE PANEL LH
Refer to PROCEDURE - Step 36 - INSTALL CENTER NO. 2 INSTRUMENT CLUSTER FINISH PANEL
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 5 - INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
Refer to WORK PROCEDURE [11/2021 - ]
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.