Check Bus 5 Line [09/2022 - 08/2023]: Procedure
- CHECK FOR OPEN IN CAN MAIN BUS LINES
- Disconnect the cable from the negative (-) auxiliary battery terminal.
- Measure the resistance according to the value(s) in the table below.
*a Component with harness connected
(Central Gateway ECU (Network Gateway ECU))Standard Resistance
Tester Connection Condition Specified Condition I173-7 (CA5H) - I173-8 (CA5L) Cable disconnected from negative (-) auxiliary battery terminal Below 70 Ω Result
Result OK NG
Result:
NG
See step 38
Result:
OK
See step 2
- CHECK FOR SHORT IN CAN BUS LINES
- Measure the resistance according to the value(s) in the table below.
*a Component with harness connected
(Central Gateway ECU (Network Gateway ECU))Standard Resistance
Tester Connection Condition Specified Condition I173-7 (CA5H) - I173-8 (CA5L) Cable disconnected from negative (-) auxiliary battery terminal 54 Ω or higher Result
Result OK NG
Result:
NG
See step 27
Result:
OK
See step 3
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR SHORT TO +B IN CAN BUS LINE
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Component with harness connected
(Central Gateway ECU (Network Gateway ECU))- - Standard Resistance
Tester Connection Condition Specified Condition I173-7 (CA5H) - I26-16 (BAT) Cable disconnected from negative (-) auxiliary battery terminal 6 kΩ or higher I173-8 (CA5L) - I26-16 (BAT) Result
Result OK NG
Result:
NG
See step 16
Result:
OK
See step 4
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR SHORT TO GND IN CAN BUS LINE
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Component with harness connected
(Central Gateway ECU (Network Gateway ECU))- - Standard Resistance
Tester Connection Condition Specified Condition I173-7 (CA5H) - I26-4 (CG) Cable disconnected from negative (-) auxiliary battery terminal 200 Ω or higher I173-8 (CA5L) - I26-4 (CG) Result
Result OK NG
Result:
OK
REPLACE CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - 09/2024]
Result:
NG
See step 5
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
- Disconnect the I216 No. 17 CAN junction connector.
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Central Gateway ECU (Network Gateway ECU) Standard Resistance
Tester Connection Condition Specified Condition I216-3 (CANH) - I26-4 (CG) Cable disconnected from negative (-) auxiliary battery terminal 200 Ω or higher I216-7 (CANL) - I26-4 (CG) Result
Result OK NG
Result:
NG
See step 10
Result:
OK
See step 6
- CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - NO. 12 CAN JUNCTION CONNECTOR)
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to No. 12 CAN Junction Connector Standard Resistance
Tester Connection Condition Specified Condition I216-4 (CANH) - I26-4 (CG) Cable disconnected from negative (-) auxiliary battery terminal 200 Ω or higher I216-8 (CANL) - I26-4 (CG) Result
Result OK NG
Result:
NG
See step 13
Result:
OK
See step 7
- Measure the resistance according to the value(s) in the table below.
- CHECK VEHICLE TYPE
Result:
B
See step 9
Result:
A
See step 8
- CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY))
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Certification ECU (Smart Key ECU Assembly) Standard Resistance
Tester Connection Condition Specified Condition I216-1 (CANH) - I26-4 (CG) Cable disconnected from negative (-) auxiliary battery terminal 200 Ω or higher I216-5 (CANL) - I26-4 (CG) Result
Result OK NG
Result:
NG
See step 11
Result:
OK
See step 9
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - AIR CONDITIONING AMPLIFIER ASSEMBLY)
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Air Conditioning Amplifier Assembly Standard Resistance
Tester Connection Condition Specified Condition I216-2 (CANH) - I26-4 (CG) Cable disconnected from negative (-) auxiliary battery terminal 200 Ω or higher I216-6 (CANL) - I26-4 (CG) Result
Result OK NG
Result:
OK
REPLACE NO. 17 CAN JUNCTION CONNECTOR
Result:
NG
See step 12
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
- Disconnect the I173 central gateway ECU (network gateway ECU) connector.
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Central Gateway ECU (Network Gateway ECU) Standard Resistance
Tester Connection Condition Specified Condition I216-3 (CANH) - I26-4 (CG) Cable disconnected from negative (-) auxiliary battery terminal 200 Ω or higher I216-7 (CANL) - I26-4 (CG) Result
Result OK NG
Result:
OK
REPLACE CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - 09/2024]
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (NO. 17 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
- CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY))
- Disconnect the I167 certification ECU (smart key ECU assembly) connector.
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Certification ECU (Smart Key ECU Assembly) Standard Resistance
Tester Connection Condition Specified Condition I216-1 (CANH) - I26-4 (CG) Cable disconnected from negative (-) auxiliary battery terminal 200 Ω or higher I216-5 (CANL) - I26-4 (CG) Result
Result OK NG
Result:
OK
REPLACE CERTIFICATION ECU (SMART KEY ECU ASSEMBLY)
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - 09/2024]
Result:
NG
REPAIR OR REPLACE CAN BRANCH LINE OR CONNECTOR (NO. 17 CAN JUNCTION CONNECTOR - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY))
- CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - AIR CONDITIONING AMPLIFIER ASSEMBLY)
- Disconnect the I49 air conditioning amplifier assembly connector.
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Air Conditioning Amplifier Assembly Standard Resistance
Tester Connection Condition Specified Condition I216-2 (CANH) - I26-4 (CG) Cable disconnected from negative (-) auxiliary battery terminal 200 Ω or higher I216-6 (CANL) - I26-4 (CG) Result
Result OK NG
Result:
OK
REPLACE AIR CONDITIONING AMPLIFIER ASSEMBLY
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - ]
Result:
NG
REPAIR OR REPLACE CAN BRANCH LINE OR CONNECTOR (NO. 17 CAN JUNCTION CONNECTOR - AIR CONDITIONING AMPLIFIER ASSEMBLY)
- CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 12 CAN JUNCTION CONNECTOR - NO. 17 CAN JUNCTION CONNECTOR)
- Disconnect the A148 No. 12 CAN junction connector.
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 12 CAN Junction Connector)*b to No. 17 CAN Junction Connector Standard Resistance
Tester Connection Condition Specified Condition A148-2 (CANH) - I26-4 (CG) Cable disconnected from negative (-) auxiliary battery terminal 200 Ω or higher A148-6 (CANL) - I26-4 (CG) Result
Result OK NG
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (NO. 12 CAN JUNCTION CONNECTOR - NO. 17 CAN JUNCTION CONNECTOR)
Result:
OK
See step 14
- CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 12 CAN JUNCTION CONNECTOR - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 12 CAN Junction Connector)*b to Main Body ECU (Multiplex Network Body ECU) Standard Resistance
Tester Connection Condition Specified Condition A148-1 (CANH) - I26-4 (CG) Cable disconnected from negative (-) auxiliary battery terminal 200 Ω or higher A148-5 (CANL) - I26-4 (CG) Result
Result OK NG
Result:
OK
REPLACE NO. 12 CAN JUNCTION CONNECTOR
Result:
NG
See step 15
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 12 CAN JUNCTION CONNECTOR - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
- Disconnect the I85 main body ECU (multiplex network body ECU) connector.
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 12 CAN Junction Connector)*b to Main Body ECU (Multiplex Network Body ECU) Standard Resistance
Tester Connection Condition Specified Condition A148-1 (CANH) - I26-4 (CG) Cable disconnected from negative (-) auxiliary battery terminal 200 Ω or higher A148-5 (CANL) - I26-4 (CG) Result
Result OK NG
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU)
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - 09/2024]
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (NO. 12 CAN JUNCTION CONNECTOR - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
- CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
- Disconnect the I216 No. 17 CAN junction connector.
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Central Gateway ECU (Network Gateway ECU) Standard Resistance
Tester Connection Condition Specified Condition I216-3 (CANH) - I26-16 (BAT) Cable disconnected from negative (-) auxiliary battery terminal 6 kΩ or higher I216-7 (CANL) - I26-16 (BAT) Result
Result OK NG
Result:
NG
See step 21
Result:
OK
See step 17
- CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - NO. 12 CAN JUNCTION CONNECTOR)
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to No. 12 CAN Junction Connector Standard Resistance
Tester Connection Condition Specified Condition I216-4 (CANH) - I26-16 (BAT) Cable disconnected from negative (-) auxiliary battery terminal 6 kΩ or higher I216-8 (CANL) - I26-16 (BAT) Result
Result OK NG
Result:
NG
See step 24
Result:
OK
See step 18
- Measure the resistance according to the value(s) in the table below.
- CHECK VEHICLE TYPE
Result:
B
See step 20
Result:
A
See step 19
- CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY))
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Certification ECU (Smart Key ECU Assembly) Standard Resistance
Tester Connection Condition Specified Condition I216-1 (CANH) - I26-16 (BAT) Cable disconnected from negative (-) auxiliary battery terminal 6 kΩ or higher I216-5 (CANL) - I26-16 (BAT) Result
Result OK NG
Result:
NG
See step 22
Result:
OK
See step 20
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - AIR CONDITIONING AMPLIFIER ASSEMBLY)
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Air Conditioning Amplifier Assembly Standard Resistance
Tester Connection Condition Specified Condition I216-2 (CANH) - I26-16 (BAT) Cable disconnected from negative (-) auxiliary battery terminal 6 kΩ or higher I216-6 (CANL) - I26-16 (BAT) Result
Result OK NG
Result:
OK
REPLACE NO. 17 CAN JUNCTION CONNECTOR
Result:
NG
See step 23
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
- Disconnect the I173 central gateway ECU (network gateway ECU) connector.
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Central Gateway ECU (Network Gateway ECU) Standard Resistance
Tester Connection Condition Specified Condition I216-3 (CANH) - I26-16 (BAT) Cable disconnected from negative (-) auxiliary battery terminal 6 kΩ or higher I216-7 (CANL) - I26-16 (BAT) Result
Result OK NG
Result:
OK
REPLACE CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - 09/2024]
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (NO. 17 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
- CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY))
- Disconnect the I167 certification ECU (smart key ECU assembly) connector.
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Certification ECU (Smart Key ECU Assembly) Standard Resistance
Tester Connection Condition Specified Condition I216-1 (CANH) - I26-16 (BAT) Cable disconnected from negative (-) auxiliary battery terminal 6 kΩ or higher I216-5 (CANL) - I26-16 (BAT) Result
Result OK NG
Result:
OK
REPLACE CERTIFICATION ECU (SMART KEY ECU ASSEMBLY)
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - 09/2024]
Result:
NG
REPAIR OR REPLACE CAN BRANCH LINE OR CONNECTOR (NO. 17 CAN JUNCTION CONNECTOR - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY))
- CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 17 CAN JUNCTION CONNECTOR - AIR CONDITIONING AMPLIFIER ASSEMBLY)
- Disconnect the I49 air conditioning amplifier assembly connector.
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Air Conditioning Amplifier Assembly Standard Resistance
Tester Connection Condition Specified Condition I216-2 (CANH) - I26-16 (BAT) Cable disconnected from negative (-) auxiliary battery terminal 6 kΩ or higher I216-6 (CANL) - I26-16 (BAT) Result
Result OK NG
Result:
OK
REPLACE AIR CONDITIONING AMPLIFIER ASSEMBLY
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - ]
Result:
NG
REPAIR OR REPLACE CAN BRANCH LINE OR CONNECTOR (NO. 17 CAN JUNCTION CONNECTOR - AIR CONDITIONING AMPLIFIER ASSEMBLY)
- CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 12 CAN JUNCTION CONNECTOR - NO. 17 CAN JUNCTION CONNECTOR)
- Disconnect the A148 No. 12 CAN junction connector.
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 12 CAN Junction Connector)*b to No. 17 CAN Junction Connector Standard Resistance
Tester Connection Condition Specified Condition A148-2 (CANH) - I26-16 (BAT) Cable disconnected from negative (-) auxiliary battery terminal 6 kΩ or higher A148-6 (CANL) - I26-16 (BAT) Result
Result OK NG
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (NO. 12 CAN JUNCTION CONNECTOR - NO. 17 CAN JUNCTION CONNECTOR)
Result:
OK
See step 25
- CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 12 CAN JUNCTION CONNECTOR - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 12 CAN Junction Connector)*b to Main Body ECU (Multiplex Network Body ECU) Standard Resistance
Tester Connection Condition Specified Condition A148-1 (CANH) - I26-16 (BAT) Cable disconnected from negative (-) auxiliary battery terminal 6 kΩ or higher A148-5 (CANL) - I26-16 (BAT) Result
Result OK NG
Result:
OK
REPLACE NO. 12 CAN JUNCTION CONNECTOR
Result:
NG
See step 26
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 12 CAN JUNCTION CONNECTOR - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
- Disconnect the I85 main body ECU (multiplex network body ECU) connector.
- Measure the resistance according to the value(s) in the table below.
*1 DLC3 - - *a Front view of wire harness connector
(to No. 12 CAN Junction Connector)*b to Main Body ECU (Multiplex Network Body ECU) Standard Resistance
Tester Connection Condition Specified Condition A148-1 (CANH) - I26-16 (BAT) Cable disconnected from negative (-) auxiliary battery terminal 6 kΩ or higher A148-5 (CANL) - I26-16 (BAT) Result
Result OK NG
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU)
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - 09/2024]
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (NO. 12 CAN JUNCTION CONNECTOR - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
- CHECK FOR SHORT IN CAN BUS LINES (NO. 17 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
- Disconnect the I216 No. 17 CAN junction connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Central Gateway ECU (Network Gateway ECU) Standard Resistance
Tester Connection Condition Specified Condition I216-3 (CANH) - I216-7 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Result OK NG
Result:
NG
See step 32
Result:
OK
See step 28
- CHECK FOR SHORT IN CAN BUS LINES (NO. 17 CAN JUNCTION CONNECTOR - NO. 12 CAN JUNCTION CONNECTOR)
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to No. 12 CAN Junction Connector Standard Resistance
Tester Connection Condition Specified Condition I216-4 (CANH) - I216-8 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Result OK NG
Result:
NG
See step 35
Result:
OK
See step 29
- Measure the resistance according to the value(s) in the table below.
- CHECK VEHICLE TYPE
Result:
B
See step 31
Result:
A
See step 30
- CHECK FOR SHORT IN CAN BUS LINES (NO. 17 CAN JUNCTION CONNECTOR - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY))
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Certification ECU (Smart Key ECU Assembly) Standard Resistance
Tester Connection Condition Specified Condition I216-1 (CANH) - I216-5 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 200 Ω or higher Result
Result OK NG
Result:
NG
See step 33
Result:
OK
See step 31
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR SHORT IN CAN BUS LINES (NO. 17 CAN JUNCTION CONNECTOR - AIR CONDITIONING AMPLIFIER ASSEMBLY)
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Air Conditioning Amplifier Assembly Standard Resistance
Tester Connection Condition Specified Condition I216-2 (CANH) - I216-6 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 200 Ω or higher Result
Result OK NG
Result:
OK
REPLACE NO. 17 CAN JUNCTION CONNECTOR
Result:
NG
See step 34
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR SHORT IN CAN BUS LINES (NO. 17 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
- Disconnect the I173 central gateway ECU (network gateway ECU) connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Central Gateway ECU (Network Gateway ECU) Standard Resistance
Tester Connection Condition Specified Condition I216-3 (CANH) - I216-7 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 1 MΩ or higher Result
Result OK NG
Result:
OK
REPLACE CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - 09/2024]
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINES OR CONNECTOR (NO. 17 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
- CHECK FOR SHORT IN CAN BUS LINES (NO. 17 CAN JUNCTION CONNECTOR - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY))
- Disconnect the I167 certification ECU (smart key ECU assembly) connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Certification ECU (Smart Key ECU Assembly) Standard Resistance
Tester Connection Condition Specified Condition I216-1 (CANH) - I216-5 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 1 MΩ or higher Result
Result OK NG
Result:
OK
REPLACE CERTIFICATION ECU (SMART KEY ECU ASSEMBLY)
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - 09/2024]
Result:
NG
REPAIR OR REPLACE CAN BRANCH LINES OR CONNECTOR (NO. 17 CAN JUNCTION CONNECTOR - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY))
- CHECK FOR SHORT IN CAN BUS LINES (NO. 17 CAN JUNCTION CONNECTOR - AIR CONDITIONING AMPLIFIER ASSEMBLY)
- Disconnect the I49 air conditioning amplifier assembly connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Air Conditioning Amplifier Assembly Standard Resistance
Tester Connection Condition Specified Condition I216-2 (CANH) - I216-6 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 1 MΩ or higher Result
Result OK NG
Result:
OK
REPLACE AIR CONDITIONING AMPLIFIER ASSEMBLY
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - ]
Result:
NG
REPAIR OR REPLACE CAN BRANCH LINES OR CONNECTOR (NO. 17 CAN JUNCTION CONNECTOR - AIR CONDITIONING AMPLIFIER ASSEMBLY)
- CHECK FOR SHORT IN CAN BUS LINES (NO. 12 CAN JUNCTION CONNECTOR - NO. 17 CAN JUNCTION CONNECTOR)
- Reconnect the I216 No. 17 CAN junction connector.
- Disconnect the A148 No. 12 CAN junction connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 12 CAN Junction Connector)*b to No. 17 CAN Junction Connector Standard Resistance
Tester Connection Condition Specified Condition A148-2 (CANH) - A148-6 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Result OK NG
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINES OR CONNECTOR (NO. 12 CAN JUNCTION CONNECTOR - NO. 17 CAN JUNCTION CONNECTOR)
Result:
OK
See step 36
- CHECK FOR SHORT IN CAN BUS LINES (NO. 12 CAN JUNCTION CONNECTOR - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 12 CAN Junction Connector)*b to Main Body ECU (Multiplex Network Body ECU) Standard Resistance
Tester Connection Condition Specified Condition A148-1 (CANH) - A148-5 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Result OK NG
Result:
OK
REPLACE NO. 12 CAN JUNCTION CONNECTOR
Result:
NG
See step 37
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR SHORT IN CAN BUS LINES (NO. 12 CAN JUNCTION CONNECTOR - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
- Disconnect the I85 main body ECU (multiplex network body ECU) connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 12 CAN Junction Connector)*b to Main Body ECU (Multiplex Network Body ECU) Standard Resistance
Tester Connection Condition Specified Condition A148-1 (CANH) - A148-5 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 1 MΩ or higher Result
Result OK NG
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU)
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - 09/2024]
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINES OR CONNECTOR (NO. 12 CAN JUNCTION CONNECTOR - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
- CHECK FOR OPEN IN CAN MAIN BUS LINES (CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
- Disconnect the I173 central gateway ECU (network gateway ECU) connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to Central Gateway ECU (Network Gateway ECU))Standard Resistance
Tester Connection Condition Specified Condition I173-7 (CA5H) - I173-8 (CA5L) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Result OK NG
Result:
OK
REPLACE CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - 09/2024]
Result:
NG
See step 39
- CHECK FOR OPEN IN CAN MAIN BUS LINES (NO. 17 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
- Reconnect the I173 central gateway ECU (network gateway ECU) connector.
- Disconnect the I216 No. 17 CAN junction connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to Central Gateway ECU (Network Gateway ECU) Standard Resistance
Tester Connection Condition Specified Condition I216-3 (CANH) - I216-7 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Result OK NG
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINES OR CONNECTOR (NO. 17 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
Result:
OK
See step 40
- CHECK FOR OPEN IN CAN MAIN BUS LINES (NO. 17 CAN JUNCTION CONNECTOR - NO. 12 CAN JUNCTION CONNECTOR)
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 17 CAN Junction Connector)*b to No. 12 CAN Junction Connector Standard Resistance
Tester Connection Condition Specified Condition I216-4 (CANH) - I216-8 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Result OK NG
Result:
OK
REPLACE NO. 17 CAN JUNCTION CONNECTOR
Result:
NG
See step 41
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR OPEN IN CAN MAIN BUS LINES (NO. 12 CAN JUNCTION CONNECTOR - NO. 17 CAN JUNCTION CONNECTOR)
- Reconnect the I216 No. 17 CAN junction connector.
- Disconnect the A148 No. 12 CAN junction connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 12 CAN Junction Connector)*b to No. 17 CAN Junction Connector Standard Resistance
Tester Connection Condition Specified Condition A148-2 (CANH) - A148-6 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Result OK NG
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINES OR CONNECTOR (NO. 12 CAN JUNCTION CONNECTOR - NO. 17 CAN JUNCTION CONNECTOR)
Result:
OK
See step 42
- CHECK FOR OPEN IN CAN MAIN BUS LINES (NO. 12 CAN JUNCTION CONNECTOR - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 12 CAN Junction Connector)*b to Main Body ECU (Multiplex Network Body ECU) Standard Resistance
Tester Connection Condition Specified Condition A148-1 (CANH) - A148-5 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Result OK NG
Result:
OK
REPLACE NO. 12 CAN JUNCTION CONNECTOR
Result:
NG
See step 43
- Measure the resistance according to the value(s) in the table below.
- CHECK FOR OPEN IN CAN MAIN BUS LINES (MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
- Reconnect the A148 No. 12 CAN junction connector.
- Disconnect the I85 main body ECU (multiplex network body ECU) connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition I85-2 (CANH) - I85-1 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω *a Front view of wire harness connector
(to Main Body ECU (Multiplex Network Body ECU))Result
Result OK NG
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU)
Refer to REMOVAL [09/2022 - 11/2022] , or refer to REMOVAL [11/2022 - 09/2024]
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINES OR CONNECTOR (MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) - NO. 12 CAN JUNCTION CONNECTOR)