Open in Bus 5 Main Bus Line [01/2019 - 09/2022]: Procedure
WARNING: This page is about a different variant/trim than selected.
- CHECK FOR OPEN IN CAN MAIN BUS LINES (NO. 3 CAN JUNCTION CONNECTOR)
- Disconnect the cable from the negative (-) auxiliary battery terminal.
- Disconnect the I94 No. 3 CAN junction connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to No. 3 CAN Junction Connector)*b to Combination Meter Assembly *c to Central Gateway ECU (Network Gateway ECU) - - Standard Resistance
Tester Connection Condition Specified Condition Connected to I94-1 (CANH) - I94-11 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Combination meter assembly I94-6 (CANH) - I94-16 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Central gateway ECU (network gateway ECU) Result
Result Proceed to OK A NG (Line to central gateway ECU (network gateway ECU)) B NG (Line to Combination meter assembly) C
Result:
A
REPLACE NO. 3 CAN JUNCTION CONNECTOR
Result:
C
See step 3
Result:
B
See step 2
- CHECK FOR OPEN IN CAN MAIN BUS LINES (CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU) - NO. 3 CAN JUNCTION CONNECTOR)
- Reconnect the I94 No. 3 CAN junction connector.
- Disconnect the I53 central gateway ECU (network gateway ECU) connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to Central Gateway ECU (Network Gateway ECU))Standard Resistance
Tester Connection Condition Specified Condition I53-15 (CA5H) - I53-16 (CA5L) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Result OK NG
Result:
OK
REPLACE CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)
Refer to REMOVAL [06/2018 - 09/2022]
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINES OR CONNECTOR (CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU) - NO. 3 CAN JUNCTION CONNECTOR)
- CHECK FOR OPEN IN CAN MAIN BUS LINES (COMBINATION METER ASSEMBLY - NO. 3 CAN JUNCTION CONNECTOR)
- Reconnect the I94 No. 3 CAN junction connector.
- Disconnect the I4 combination meter assembly connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to Combination Meter Assembly)Standard Resistance
Tester Connection Condition Specified Condition I4-9 (CANH) - I4-25 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Result OK NG
Result:
OK
REPLACE COMBINATION METER ASSEMBLY
Refer to REMOVAL [01/2019 - 03/2019] , or refer to REMOVAL [03/2019 - 09/2022]
Result:
NG
REPAIR OR REPLACE CAN MAIN BUS LINES OR CONNECTOR (COMBINATION METER ASSEMBLY - NO. 3 CAN JUNCTION CONNECTOR)