Installation [12/2022 - ]: Procedure
- INSTALL OIL PRESSURE CONTROL VALVE ASSEMBLY
- Apply a small amount of engine oil to the O-ring of the oil pressure control valve assembly.
- Using an 8 mm socket wrench, install the oil pressure control valve assembly to the No. 2 timing chain cover assembly with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
NOTE:- When reusing the oil pressure control valve assembly, inspect the O-ring.
- Make sure that the O-ring is not cracked or does not move out of place during installation.
- If the oil pressure control valve assembly is dropped or subjected to a strong impact, replace it with a new one.
- Connect the oil pressure control valve assembly connector.
- INSPECT FOR ENGINE OIL LEAK
Refer to PROCEDURE - Step 6 [12/2022 - 03/2023] , or refer to PROCEDURE - Step 6 [03/2023 - ]
- INSTALL REAR ENGINE UNDER COVER RH
- INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 5 [12/2022 - 03/2023] , or refer to PROCEDURE - Step 5 [03/2023 - ]