Installation [02/2019 - 06/2020]: Procedure
- INSTALL HV FLOOR UNDER WIRE WARNING:
Be sure to wear insulated gloves.
- for AWD:
- Install the HV floor under wire to the rear traction motor with transaxle assembly with the 2 bolts.
*a Waterproof Seal Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
NOTE:- Make sure that the connector is fully engaged.
- Do not damage the terminals, interlock connector or rear traction motor with transaxle assembly during installation.
- Do not touch the waterproof seal or terminals of the connector.
- Do not allow any foreign matter or water to enter the rear traction motor with transaxle assembly.
- Although the connector may feel loose, this is not due to a malfunction.
- Engage the clamp.
- Install the HV floor under wire to the rear traction motor with transaxle assembly with the 2 bolts.
- Insert the HV floor under wire into the floor panel hole and engage the grommet.
- for 2WD:
*A for 2WD *B for AWD Bolt Nut - Install the 2 nuts.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Install the 2 nuts.
- for AWD:
- Install the 2 nuts and 2 bolts.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Install the 2 nuts and 2 bolts.
- Install a new 2 stud clamps.
- Install the 3 bolts and nut.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Install a new 2 stud clamps.
- Install the bolt and 2 nuts.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Install the 2 nuts.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Connect the engine room main wire to the vehicle body with the nut.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Engage the guide and 2 claws to install the No. 1 terminal cap.
Install in this Direction
- for AWD:
- INSTALL FUEL TANK ASSEMBLY
- w/ Canister Pump Module:
Refer to INSTALLATION [02/2019 - ]
- w/o Canister Pump Module:
Refer to INSTALLATION [11/2018 - 08/2020]
- w/ Canister Pump Module:
- INSTALL EXHAUST MANIFOLD
Refer to INSTALLATION [11/2018 - 08/2020]
- INSTALL FRONT EXHAUST PIPE ASSEMBLY
Refer to PROCEDURE - Step 6
- CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
- Connect the transmission control cable assembly to the vehicle body with the nut.
Torque: 6.0 N.m (61 kgf/cm, 53 in.lbf)
- Connect the transmission control cable assembly to the vehicle body with the nut.
- INSTALL ENGINE SERVICE COVER CUSHION
- INSTALL NO. 2 ENGINE SERVICE COVER CUSHION
- INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR
- INSTALL FRONT LOWER NO. 1 FLOOR HEAT INSULATOR
- INSTALL FRONT NO. 2 FLOOR HEAT INSULATOR
- INSTALL FRONT CENTER FLOOR COVER
- INSTALL FRONT FLOOR COVER RH
Refer to PROCEDURE - Step 40
- INSTALL FRONT FLOOR COVER LH
Refer to PROCEDURE - Step 41
- INSTALL ENGINE UNDER COVER HEAT INSULATOR
Refer to PROCEDURE - Step 42
- INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 65
- INSTALL NO. 1 ENGINE UNDER COVER
Refer to PROCEDURE - Step 66
- INSTALL FRONT FENDER FRONT SPLASH SHIELD RH
Refer to PROCEDURE - Step 68
- INSTALL FRONT FENDER FRONT SPLASH SHIELD LH
Refer to PROCEDURE - Step 67
- INSTALL FRONT WHEELS
Refer to INSTALLATION [11/2018 - ]
- CONNECT HV FLOOR UNDER WIRE WARNING:
Be sure to wear insulated gloves.
- Engage the clamp.
- Install the HV under floor wire with the nut.
Torque: 7.6 N.m (77 kgf/cm, 67 in.lbf)
- Engage the clamp.
- Engage the 3 claws to install the No. 4 relay block cover.
- Connect the shield ground to the HV battery.
- Connect the 2 HV battery junction block assembly connectors.NOTE:
Make sure that the connectors are connected securely.
- Engage the clamp.
- INSTALL NO. 1 HV BATTERY COVER PANEL RH
Refer to PROCEDURE - Step 17
- INSTALL REAR SEAT CUSHION LEG SUB-ASSEMBLY
Refer to PROCEDURE - Step 4
- INSTALL BATTERY SERVICE COVER BOARD
Refer to PROCEDURE - Step 5
- INSTALL NO. 2 BATTERY SERVICE COVER BOARD
Refer to PROCEDURE - Step 6
- INSTALL REAR DOOR SCUFF PLATE LH
Refer to PROCEDURE - Step 60
- INSTALL NO. 3 BATTERY SERVICE COVER BOARD
Refer to PROCEDURE - Step 8
- INSTALL REAR DOOR SCUFF PLATE RH
HINT:
Use the same procedure as for the LH side.
- INSTALL REAR SEAT CUSHION LOCK HOOK
Refer to PROCEDURE - Step 13
- INSTALL BENCH TYPE REAR SEAT CUSHION ASSEMBLY
Refer to PROCEDURE - Step 14
- CONNECT HV FLOOR UNDER WIRE
Refer to PROCEDURE - Step 13
- CONNECT ENGINE ROOM MAIN WIRE WARNING:
Be sure to wear insulated gloves.
NOTE:Do not allow any foreign matter or water to enter the inverter with converter assembly.
- Connect the inverter with converter assembly connector and move the lock lever to lock them.NOTE:
- Do not touch the waterproof seal or terminals of the connectors.
- To prevent damage due to static electricity, do not touch the terminals of the disconnected connectors.
- Do not damage the terminals, connector housing or inverter with converter assembly when connecting the connectors.
- Connect the inverter with converter assembly connector and move the lock lever to lock them.
- INSTALL NO. 2 INVERTER PROTECTOR (for AWD, w/ NO. 2 INVERTER PROTECTOR)
Refer to PROCEDURE - Step 16
- INSTALL SERVICE PLUG GRIP
Refer to INSTALLATION [11/2018 - ]
- INSTALL NO. 1 FLOOR UNDER COVER (for AWD, w/ NO. 1 FLOOR UNDER COVER)
Refer to PROCEDURE - Step 36