Inspection [11/2018 - ]: Procedure
WARNING: This page is about a different variant/trim than selected.
- INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
- Measure the resistance according to the value(s) in the table below.
*a Component without harness connected
(Park/Neutral Position Switch Assembly)Standard Resistance
Tester Connection Condition Specified Condition 4 (B) - 9 (L) Shift lever in P or N Below 1 Ω 1 (RB) - 3 (PL) Shift lever in P Below 1 Ω 1 (RB) - 2 (RL) Shift lever in R Below 1 Ω 1 (RB) - 8 (NL) Shift lever in N Below 1 Ω 1 (RB) - 7 (DL) Shift lever in D, S, "+" or "-" Below 1 Ω 4 (B) - 9 (L) Shift lever not in P or N 10 kΩ or higher 1 (RB) - 3 (PL) Shift lever not in P 10 kΩ or higher 1 (RB) - 2 (RL) Shift lever not in R 10 kΩ or higher 1 (RB) - 8 (NL) Shift lever not in N 10 kΩ or higher 1 (RB) - 7 (DL) Shift lever not in D, S, "+" or "-" 10 kΩ or higher If the result is not as specified, replace the park/neutral position switch assembly.
- Measure the resistance according to the value(s) in the table below.