LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2022 >> RAV4 LE, FWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 4 (Hybrid Battery Control System - Service Information (5 Of 7)) >> HV BATTERY (for LITHIUM-ION BATTERY) >> Charging [10/2022 - 10/2023] >> Procedure

Charging [10/2022 - 10/2023]: Procedure

WARNING: This page is about a different variant/trim than selected.
  1. INSPECT AUXILIARY BATTERY VOLTAGE 
    1. Measure the auxiliary battery voltage.

      Standard Voltage

      Approximately 11 V or more

      HINT: 

      • The horn should sound clearly.
      • If the voltage is 10 V or less, either charge the auxiliary battery (charging usually takes about 1 hour), or replace it with an auxiliary battery that is already charged.
  2. PREPARATION FOR HV BATTERY CHARGING 
    WARNING:
    • The hybrid system has high-voltage circuits. Accidents, such as electric shock, or electric leaks may result if the hybrid system is not operated in a correct manner. Make sure to follow the correct procedure.

      Refer to PRECAUTION [11/2018 - ]

    • Be sure to wear insulated gloves.

    HINT: 

    • Removing the service plug grip interrupts the high voltage circuit.
    • High voltage wiring connectors are orange.
    1. Check the charge level of the HV battery.
      1. If the hybrid system fails to start and "Traction Battery Needs to be Protected Shift into P to Restart" is displayed on the multi-information display, the HV battery may be discharged.
      2. Confirm if the engine starts. If the engine starts, leave it idling with the shift lever in P until the engine stops (self charge has completed).

        If the engine cannot start, charge the HV battery.

        HINT: 

        • Before performing external charging, always use the Techstream to perform troubleshooting.
        • Charging time using the THS charger is 10 minutes per charge cycle. The charging time when using a THS charger is a short charging time (when the HV battery temperature is 25°C (77°F), 10 minutes may be sufficient, if the HV battery temperature is 0°C (32°F), then three 10 minute charge cycles may be required) for putting the engine in a condition where it can be started (the system can enter the READY-on state). (The THS charger will automatically stop 10 minutes after charging starts.)
    2. Remove the service plug grip.

      Refer to REMOVAL [10/2022 - 10/2023]

    3. Check the terminal voltage.
      1. Disconnect the engine room main wire.

        Refer to PROCEDURE - Step 4

      2. Remove the connector cover assembly.

        Refer to PROCEDURE - Step 9

      3. Check the terminal voltage.

        Refer to PROCEDURE - Step 10

      4. Install the connector cover assembly.

        See step  6

      5. Connect the engine room main wire.

        Refer to PROCEDURE - Step 31

    4. Remove the bench type rear seat cushion assembly.

      Refer to PROCEDURE - Step 1

    5. Remove the rear seat cushion lock hook.

      Refer to PROCEDURE - Step 2

    6. Remove the rear door scuff plate LH.

      Refer to PROCEDURE - Step 8

    7. Remove the No. 3 battery service cover board.

      Refer to PROCEDURE - Step 4

    8. Remove the rear door scuff plate RH.

      HINT: 

      Use the same procedure as for the LH side.

    9. Remove the No. 2 battery service cover board.

      Refer to PROCEDURE - Step 6

    10. Remove the battery service cover board.

      Refer to PROCEDURE - Step 7

    11. Remove the rear seat cushion leg sub-assembly.

      Refer to PROCEDURE - Step 8

    12. Remove the No. 1 HV battery cover panel RH.

      See step  9

    13. Disconnect the HV floor under wire.
      1. Disconnect the 2 HV battery junction block assembly connectors.
        NOTE:

        Insulate each disconnected high-voltage connector with insulating tape. Wrap the connector from the wire harness side to the end of the connector.

        GTY997020Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
        *a Shield Ground
      2. Disconnect the shield ground from the HV battery.
    14. Inspect the electrical insulation of the HV battery.
      1. Using a megohmmeter set to 500 V, measure the resistance according to the value(s) in the table below.
        NOTE:

        Be sure to set the megohmmeter to 500 V when performing this test. Using a setting higher than 500 V can result in damage to the component being inspected.

        Standard Resistance

        Tester Connection Condition Specified Condition
        1 - Body ground Power switch off 10 MΩ or higher
        2 - Body ground Power switch off 10 MΩ or higher
        GTY996308Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
        *a Service Plug Grip Removed
        (Service Plug Grip Connecting Terminals)
      2. Using a megohmmeter set to 500 V, measure the resistance according to the value(s) in the table below.
        NOTE:

        Be sure to set the megohmmeter to 500 V when performing this test. Using a setting higher than 500 V can result in damage to the component being inspected.

        GTY996822Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
        *a Component without harness connected
        (HV Battery Junction Block Assembly)

        Standard Resistance

        Tester Connection Condition Specified Condition
        s2-1 (CBI) - Body ground Power switch off 10 MΩ or higher
        s3-1 (CEI) - Body ground Power switch off 10 MΩ or higher
    15. Connect the THS charger in the order shown in the illustration.
      GTY996112Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 HV Battery *2 HV Floor Under Wire
      *3 Inverter with Converter Assembly *4 No. 1 HV Battery Cover Panel RH
      *a EV Bonding Cable (Green Cable) *b Low Voltage Cable
      *c High Voltage Cable *d Power Input Plug
      *e Grounded AC 100 to 240 V Receptacle *f THS Charger
      NOTE:

      Connect all of the THS charger cables in the order shown in the illustration to prevent electrical shock.

    16. Connect the 2 SST (high voltage cable) connectors to the HV battery junction block assembly.
      GTY996004Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      • SST: 09882-10090 
    17. Temporarily install the No. 1 HV battery cover panel RH with the bolt and nut.
      GTY995877Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 7.5 N.m (76 kgf/cm, 66 in.lbf) 

      NOTE:

      Be careful not to pinch SST (high voltage cable).

    18. Connect the SST (high voltage cable) terminal to the position shown in the illustration with the nut.

      Torque: 7.5 N.m (76 kgf/cm, 66 in.lbf) 

    19. Connect SST (EV bonding cable (green cable)) to the position shown in the illustration with the nut.
      • SST: 09882-10070 
      GTY995963Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 7.5 N.m (76 kgf/cm, 66 in.lbf) 

    20. Connect SST (EV bonding cable (green cable)) to SST (THS charger).
      GTY424222Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      • SST: 09880-10021 
        1. 09881-10041
    21. Connect SST (low voltage cable) to the position shown in the illustration with the bolt.
      GTY996449Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 7.5 N.m (76 kgf/cm, 66 in.lbf) 

    22. Connect SST (low voltage cable) and SST (high voltage cable) to SST (THS charger) in the order shown in the illustration.
      GTY512416Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Low Voltage Cable
      *b High Voltage Cable
    23. Install the service plug grip.

      Refer to INSTALLATION [11/2018 - ]

    24. Connect the cable to the negative (-) auxiliary battery terminal.

      Refer to INSTALLATION [08/2020 - ]

    25. Connect SST (power input plug) of SST (THS charger) to a grounded AC 100 to 240 V receptacle.
      • SST: 09881-1008109881-1009009881-10050 
      NOTE:

      Always use an AC 100 to 240 V receptacle with a properly functioning ground. The ground is designed to reduce the chance of electric shock if a malfunction occurs. Do not use the charger if any of the pins on its plug have been damaged or removed.

  3. HV BATTERY CHARGING 
    1. Connect the Techstream to the DLC3.
    2. Turn the power switch on (IG).
    3. Enter the following menus: Powertrain / Hybrid Control / Active Test / Hybrid/EV Battery Charge

      Powertrain > Hybrid Control > Active Test 

      Active Test Display
      Hybrid/EV Battery Charge
      Data List Display
      SMRG Status
      SMRB Status

      HINT: 

      • While performing the "Hybrid/EV Battery Charge" Active Test, check the Data List items "System Main Relay Status - SMRB" and "System Main Relay Status - SMRG".
      • If the values of the Data List items are not as specified in the table below, turn the Techstream and the power switch off and then perform the HV battery charging procedure again.

      "System Main Relay Status - SMRB" and "System Main Relay Status - SMRG" in Data List during "Hybrid/EV Battery Charge" Active Test

      Step Active Test
      "Hybrid/EV Battery Charge"
      THS charger START
      Switch
      Data List
      "System Main Relay Status - SMRB"
      Data List
      "System Main Relay Status - SMRG"
      1 OFF OFF OFF OFF
      2 OFF → ON OFF OFF → ON OFF → ON
      3 ON OFF → ON ON ON
    4. Make sure that the EMERGENCY STOP switch is in the reset condition (the switch is turned clockwise and released).
    5. Make sure that the BREAKER is in the ON position.
    6. Turn the THS charger MAIN switch on.
      GTY315353Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      HINT: 

      The MAIN indicator will illuminate (green).

    7. Press the START switch.
      GTY322006Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      HINT: 

      • When the START switch is turned on, the INITIAL CHECK indicator illuminates and an initial check starts. When the initial check completes successfully, the INITIAL CHECK indicator turns off, the CHARGING indicator illuminates and charging will start at the same time.
      • While the INITIAL CHECK indicator is illuminated, the insulation, 400 V output, emergency stop switch, connector connections and ground connection are inspected.
    8. Repeat the charge cycle 3 times. When the last cycle has finished, turn the THS charger MAIN switch off.

      HINT: 

      • Charging time using the THS charger is 10 minutes per charge cycle. The charging time when using a THS charger is a short charging time (when the battery temperature is 25°C (77°F), 10 minutes may be sufficient, if the battery temperature is 0°C (32°F), then three 10 minute charge cycles may be required) for putting the engine in a condition where it can be started (the system can enter the READY-on state). (The THS charger will automatically stop 10 minutes after charging starts.)
      • There is very little chance of overcharging the HV battery during the second or third charging cycle. The SOC will not likely increase beyond the upper limit because it was low enough to prevent the engine from starting. Even if the SOC was to increase enough to exceed the limit, the hybrid vehicle control ECU will stop the Active Test to prevent overcharging.
      • Cranking the engine once causes the SOC to drop approximately 1%.
      • Charging the HV battery once (10 minutes) using the THS charger restores the SOC approximately 2%.
    9. Turn the power switch off.
    10. Remove the THS charger and connect the HV floor under wire (for HV Battery).
      1. Disconnect SST (power inlet plug) of SST (THS charger) from the grounded AC 100 to 240 V receptacle.
      2. Disconnect the cable from the negative (-) auxiliary battery terminal.

        Refer to REMOVAL [10/2022 - 10/2023]

      3. Remove the service plug grip.

        Refer to REMOVAL [10/2022 - 10/2023]

      4. Disconnect SST (high voltage cable) and SST (low voltage cable) from SST (THS charger) in the order shown in the illustration.
        GTY443607Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
        *a Low Voltage Cable
        *b High Voltage Cable
      5. Remove the bolt and disconnect SST (low voltage cable).
        GTY996449Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      6. Disconnect SST (EV bonding cable (green cable)) from SST (THS charger).
        GTY424222Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      7. Remove the nut and disconnect SST (EV bonding cable (green cable)).
        GTY995963Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      8. Remove the nut and disconnect the SST (high voltage cable) terminal.
        GTY995877Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      9. Remove the bolt, nut and No. 1 HV battery cover panel RH.
      10. Disconnect the 2 SST (high voltage cable) connectors from the HV battery junction block assembly.
        GTY996004Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      11. Connect the shield ground to the HV battery.
      12. Connect the 2 HV battery junction block assembly connectors.
        NOTE:

        Make sure that the connectors are connected securely.

      13. Install the No. 1 HV battery cover panel RH.

        See step  11

      14. Install the service plug grip.

        Refer to INSTALLATION [11/2018 - ]

    11. Connect the cable to the negative (-) auxiliary battery terminal.

      Refer to INSTALLATION [08/2020 - ]

    12. Turn the power switch on (READY) and check if the engine starts.

      HINT: 

      If the engine does not start, perform the HV battery charging operation again.

    13. Install the rear seat cushion leg sub-assembly.

      Refer to PROCEDURE - Step 4

    14. Install the battery service cover board.

      Refer to PROCEDURE - Step 5

    15. Install the rear No. 2 battery service cover board.

      Refer to PROCEDURE - Step 6

    16. Install the rear door scuff plate LH.

      Refer to PROCEDURE - Step 58

    17. Install the rear No. 3 battery service cover board.

      Refer to PROCEDURE - Step 8

    18. Install the rear door scuff plate RH.

      HINT: 

      Use the same procedure as for the LH side.

    19. Install the rear seat cushion lock hook.

      Refer to PROCEDURE - Step 13

    20. Install the bench type rear seat cushion assembly.

      Refer to PROCEDURE - Step 14

    21. Install the battery service hole cover.

      Refer to PROCEDURE - Step 2

  4. CHECK HV BATTERY AFTER HV BATTERY CHARGE 
    1. Check for DTCs.

      Refer to DTC CHECK / CLEAR [06/2020 - ]

    2. Perform the self-charging operation.
      1. Start the engine and leave it idling with the shift lever in P until the engine stops.

        HINT: 

        When the engine stops idling, this indicates that self-charging is complete. Perform any initialization procedures required after the cable is disconnected and reconnected to the negative (-) auxiliary battery terminal.