Installation [12/2021 - ]: Procedure
- INSTALL STARTER ASSEMBLY
- Install the starter assembly to the cylinder block sub-assembly with the 2 bolts.
Torque: 46 N.m (469 kgf/cm, 34 ft.lbf)
- Connect the No. 2 engine wire to terminal 30 with the nut.
Torque: 9.8 N.m (100 kgf/cm, 87 in.lbf)
- Close the terminal cap.
- Connect the starter assembly connector.
- Install the No. 1 radiator bracket to the front engine mounting with the bolt.
Torque: 19 N.m (194 kgf/cm, 14 ft.lbf)
- Attach the 3 clamps to install the radiator hose, vacuum hoses and No. 2 engine wire to the No. 1 radiator bracket.
- Attach the 2 clamps to install the engine wire and No. 2 engine wire to the automatic transaxle assembly.
- Attach the clamp to install the radiator hose to the fan shroud assembly.
- Install the engine wire to the vehicle body with the bolt.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Install the starter assembly to the cylinder block sub-assembly with the 2 bolts.
- INSTALL FLYWHEEL HOUSING SIDE COVER
- Align the protrusion with the cylinder block sub-assembly and attach the claw as shown in the illustration to install the flywheel housing side cover.NOTE:
- Make sure the claw makes a click sound, indicating that it fits tightly.
- Replace the flywheel housing side cover with a new one if the claw does not fit tightly or is deformed.
- Align the protrusion with the cylinder block sub-assembly and attach the claw as shown in the illustration to install the flywheel housing side cover.
- INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
Refer to PROCEDURE - Step 2
- INSTALL INLET AIR CLEANER ASSEMBLY
Refer to PROCEDURE - Step 3
- INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 76
- INSTALL FRONT ENGINE MOUNTING INSULATOR
Refer to INSTALLATION [11/2018 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 2 [11/2018 - 10/2023] , or refer to PROCEDURE - Step 2 [10/2023 - ]