LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2022 >> Prius XLE >> Repair and Diagnosis >> Accessories & Equipment >> Exterior Lights >> Automatic High Beam System - Diagnostic Codes & Circuit Tests >> Automatic High Beam System >> Circuit Tests >> Automatic High Beam Switch Circuit [11/2015 - 07/2020] >> Procedure

Automatic High Beam Switch Circuit [11/2015 - 07/2020]: Procedure

  1. READ VALUE USING TECHSTREAM 
    1. Connect the Techstream to the DLC3.
    2. Turn the power switch on (IG).
    3. Turn the Techstream on.
    4. Enter the following menus: Body Electrical / Main Body / Data List.
    5. Read the Data List according to the display on the Techstream.

      Body Electrical > Main Body > Data List 

      Tester Display Measurement Item Range Normal Condition Diagnostic Note
      Auto High Beam Main Switch Automatic high beam main switch (No. 2 combination switch assembly) signal ON or OFF ON: Automatic high beam main switch (No. 2 combination switch assembly) pressed
      OFF: Automatic high beam main switch (No. 2 combination switch assembly) not pressed
      -

      OK

      Normal conditions listed above are displayed.

      Result

      Proceed to
      OK
      NG

    Result: 

    OK 

    PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE. Refer to  PROBLEM SYMPTOMS TABLE [11/2015 - 12/2018]  , or refer to  PROBLEM SYMPTOMS TABLE [12/2018 - 07/2020] 

    Result: 

    NG 

    See step  2

  2. INSPECT AUTOMATIC HIGH BEAM MAIN SWITCH (NO. 2 COMBINATION SWITCH ASSEMBLY) 
    1. Remove the automatic high beam main switch (No. 2 combination switch assembly).

      Refer to REMOVAL [11/2015 - ]

    2. Inspect the automatic high beam main switch (No. 2 combination switch assembly).

      Refer to INSPECTION [11/2015 - ]

      OK

      Automatic high beam main switch is normal.

      Result

      Proceed to
      OK
      NG

    Result: 

    NG 

    REPLACE AUTOMATIC HIGH BEAM MAIN SWITCH (NO. 2 COMBINATION SWITCH ASSEMBLY). Refer to  REMOVAL [11/2015 - ] 

    Result: 

    OK 

    See step  3

  3. CHECK HARNESS AND CONNECTOR (AUTOMATIC HIGH BEAM MAIN SWITCH (NO. 2 COMBINATION SWITCH ASSEMBLY) - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) AND BODY GROUND) 
    1. Disconnect the F17 main body ECU (multiplex network body ECU) connector.
    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      (F49, F17)

      (F49)

      (F17)

      Tester Connection Condition Specified Condition
      F49-9 (+B) - F17-17 (AHBI) Always Below 1 Ω
      F49-9 (+B) or F17-17 (AHBI) - Body ground Always 10 kΩ or higher
      F49-8 (E) - Body ground Always Below 1 Ω

      Result

      Proceed to
      OK
      NG

    Result: 

    OK 

    REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to  REMOVAL [11/2015 - 12/2018]  , or refer to  REMOVAL [12/2018 - 07/2020] 

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR