Inspection [09/2021 - 11/2023]: Procedure
WARNING: This page is about a different variant/trim than selected.
- INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
- Measure the resistance according to the value(s) in the table below.
*a Component without harness connected
(Park/Neutral Position Switch assembly)Standard Resistance
Tester Connection Condition Specified Condition 2 (RB) - 6 (PL) Shift lever in P Below 1 Ω Shift lever not in P 10 kΩ or higher 2 (RB) - 1 (RL) Shift lever in R Below 1 Ω Shift lever not in R 10 kΩ or higher 2 (RB) - 9 (NL) Shift lever in N Below 1 Ω Shift lever not in N 10 kΩ or higher 2 (RB) - 7 (DL) Shift lever in D, M, "+" or "-" Below 1 Ω Shift lever not in D, M, "+" or "-" 10 kΩ or higher 4 (B) - 5 (L) Shift lever in P or N Below 1 Ω Shift lever not in P or N 10 kΩ or higher - If the result is not as specified, replace the park/neutral position switch assembly.
- Measure the resistance according to the value(s) in the table below.