Installation [04/2018 - 08/2020]: Procedure
- TEMPORARILY INSTALL AIR CONDITIONER UNIT ASSEMBLY
Refer to PROCEDURE - Step 1 [04/2018 - 08/2019] , or refer to PROCEDURE - Step 1 [08/2019 - 08/2021]
- INSTALL INSTRUMENT PANEL REINFORCEMENT ASSEMBLY WITH AIR CONDITIONER UNIT ASSEMBLY NOTE:
- Be sure to support the air conditioner unit assembly when installing it. Failure to do so may cause the bracket of the air conditioner unit assembly to break.
- When installing the air conditioner unit assembly, eliminate static electricity by touching the vehicle body to prevent the components from being damaged.
- Connect each connector.
Install in this Direction - - - Engage each clamp.
- Temporarily install the instrument panel reinforcement assembly with air conditioner unit assembly as shown in the illustration.
- Install the 4 bolts (A).
Bolt (A) Bolt (B) Nut - - Torque: 25 N*m (255 kgf*cm, 18 ft.*lbf)
- Connect the brake pedal assembly with the bolt (B).
Torque: 15 N*m (153 kgf*cm, 11 ft.*lbf)
- Temporarily install the nut.
- Install the 3 bolts.
Torque: 25 N*m (255 kgf*cm, 18 ft.*lbf)
- Install the 2 hole plugs.
- Install a new cooler unit drain hose grommet.NOTE:
- If the drain cooler hose is disconnected from the cooler unit drain hose grommet, make sure to replace the cooler unit drain hose grommet with a new one. Failure to do so may lead to water ingress.
- Make sure that the entire lip of the cooler unit drain hose grommet is securely engaged to the vehicle body.
*a Lip - Connect the drain cooler hose.
Install the front floor mat to its original position as shown in the illustration.
- Engage each clamp.
*a Lock Lever Move in this Direction - Temporarily connect the connector and then move the lock lever as shown in the illustration to securely connect the connector.NOTE:
When connecting any airbag connector, take care not to damage the airbag wire harness.
- Check that there is no looseness in the installed parts of the airbag sensor assembly.
- Connect the connector.
- Engage each clamp.
- Connect the connector holder with the 2 nuts.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Connect the 3 earth wires with the 3 bolts.
Torque: 8.5 N*m (87 kgf*cm, 75 in.*lbf)
- Connect the connector.
- INSTALL INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY WITH MAIN BODY ECU
Refer to PROCEDURE - Step 3
- INSTALL NO. 3 INSTRUMENT PANEL TO COWL BRACE SUB-ASSEMBLY
Refer to PROCEDURE - Step 5 [04/2018 - 08/2019] , or refer to PROCEDURE - Step 5 [08/2019 - 08/2021]
- INSTALL NO. 2 INSTRUMENT PANEL BRACE SUB-ASSEMBLY
Refer to PROCEDURE - Step 6 [04/2018 - 08/2019] , or refer to PROCEDURE - Step 6 [08/2019 - 08/2021]
- INSTALL NO. 1 INSTRUMENT PANEL BRACE SUB-ASSEMBLY
- Install the No. 1 instrument panel brace sub-assembly with the bolt and nut.
Bolt
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
Nut
Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf)
- Temporarily install the screw.
HINT:
Do not fully tighten the screw.
- Engage each clamp.
- Connect the earth wire with the bolt.
Torque: 8.5 N*m (87 kgf*cm, 75 in.*lbf)
- Install the No. 1 instrument panel brace sub-assembly with the bolt and nut.
- INSTALL AIR CONDITIONER UNIT ASSEMBLY
Refer to PROCEDURE - Step 8 [04/2018 - 08/2019] , or refer to PROCEDURE - Step 8 [08/2019 - 08/2021]
- INSTALL NO. 3 DASH PANEL INSULATOR PAD
Refer to PROCEDURE - Step 9 [04/2018 - 08/2019] , or refer to PROCEDURE - Step 9 [08/2019 - 08/2021]
- INSTALL NO. 1 CONSOLE BOX DUCT
Refer to PROCEDURE - Step 10 [04/2018 - 08/2019] , or refer to PROCEDURE - Step 10 [08/2019 - 08/2021]
- INSTALL FLOOR CARPET BRACKET LH
Refer to PROCEDURE - Step 11 [04/2018 - 08/2019] , or refer to PROCEDURE - Step 11 [08/2019 - 08/2021]
- INSTALL FLOOR CARPET BRACKET RH
Refer to PROCEDURE - Step 12 [04/2018 - 08/2019] , or refer to PROCEDURE - Step 12 [08/2019 - 08/2021]
- INSTALL REAR NO. 3 AIR DUCT
Refer to PROCEDURE - Step 13 [04/2018 - 08/2019] , or refer to PROCEDURE - Step 13 [08/2019 - 08/2021]
- INSTALL REAR NO. 4 AIR DUCT
Refer to PROCEDURE - Step 14 [04/2018 - 08/2019] , or refer to PROCEDURE - Step 14 [08/2019 - 08/2021]
- INSTALL REAR NO. 1 AIR DUCT
Refer to PROCEDURE - Step 15 [04/2018 - 08/2019] , or refer to PROCEDURE - Step 15 [08/2019 - 08/2021]
- INSTALL REAR NO. 2 AIR DUCT
Refer to PROCEDURE - Step 16 [04/2018 - 08/2019] , or refer to PROCEDURE - Step 16 [08/2019 - 08/2021]
- INSTALL ACCELERATOR PEDAL
Refer to PROCEDURE - Step 1
- INSTALL ACCELERATOR PEDAL PAD
Refer to PROCEDURE - Step 2
- INSTALL COOLER (ROOM TEMP. SENSOR) THERMISTOR
Refer to PROCEDURE - Step 19 [04/2018 - 08/2019] , or refer to PROCEDURE - Step 19 [08/2019 - 08/2021]
- INSTALL DRIVING SUPPORT ECU ASSEMBLY
- INSTALL NO. 1 CLEARANCE WARNING BUZZER (w/ Intelligent Parking Assist System)
Refer to PROCEDURE - Step 1
- INSTALL DCM (TELEMATICS TRANSCEIVER) WITH BRACKET
Refer to PROCEDURE - Step 6
- INSTALL STEREO COMPONENT EQUALIZER ASSEMBLY (w/ Active Noise Control System)
Refer to PROCEDURE - Step 1
- INSTALL ECU INTEGRATION BOX RH
Refer to PROCEDURE - Step 2
- INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
Refer to INSTALLATION [04/2018 -]
- INSTALL STEERING COLUMN ASSEMBLY
for Manual Tilt and Manual Telescopic Steering Column:
Refer to INSTALLATION [04/2018 -]
for Power Tilt and Power Telescopic Steering Column:
Refer to INSTALLATION [04/2018 -]
- INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
Refer to INSTALLATION [04/2018 -]
- INSTALL FRONT SEAT ASSEMBLY LH
Refer to INSTALLATION [04/2018 - 08/2020]
- INSTALL FRONT SEAT ASSEMBLY RH
HINT:
Use the same procedure as for the LH side.
- CONNECT NO. 2 AIR CONDITIONING TUBE AND ACCESSORY ASSEMBLY
- Remove the vinyl tape from the No. 2 air conditioning tube and accessory assembly.
- Sufficiently apply compressor oil to 2 new O-rings and the fitting surfaces of the No. 2 air conditioning tube and accessory assembly.
Compressor Oil
ND-OIL 12 or equivalent
- Install the 2 O-rings to the No. 2 air conditioning tube and accessory assembly.NOTE:
Keep the O-rings and O-ring fitting surfaces free of foreign matter.
- Connect the No. 2 air conditioning tube and accessory assembly.
- Rotate the hook connector as shown in the illustration.
- Insert the tube joint into the fitting hole securely and install the bolt.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- CONNECT INLET HEATER WATER HOSE
- CONNECT OUTLET HEATER WATER HOSE
- INSTALL FRONT CENTER UPPER SUSPENSION BRACE SUB-ASSEMBLY
Refer to PROCEDURE - Step 5
- INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY
Refer to INSTALLATION [04/2018 -]
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 2
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1
- CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT
Refer to PROCEDURE - Step 2
- WARM UP ENGINE
Refer to PROCEDURE - Step 3
- INSPECT FOR REFRIGERANT LEAK
Refer to PROCEDURE - Step 5