LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2022 >> Avalon XLE >> Repair and Diagnosis >> External Pages >> Different car >> Section 28 (Engine Control System (Service Information) [A25A-FKS]) >> Active Control Engine Mount >> Installation [08/2020 - ] >> Procedure

Installation [08/2020 - ]: Procedure

WARNING: This page is about a different car, the 2021 Toyota Avalon. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL FRONT ENGINE MOUNTING INSULATOR 
    1. Install the stay to the front engine mounting insulator with the nut.

      Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf) 

    2. Install the front engine mounting insulator to the front frame assembly with the 3 nuts.

      Torque: 72 N*m (734 kgf*cm, 53 ft.*lbf) 

    3. Install the front engine mounting bracket to the transaxle housing with the 3 bolts.
      GTY948686Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Bolt (A), (B) and (C) 

      Torque: 42 N*m (428 kgf*cm, 31 ft.*lbf) 

      NOTE:

      Temporarily tighten the bolt (A), and then fully tighten the 3 bolts in the order of (B), (C) and (A).

    4. Install the front engine mounting bracket to the front engine mounting insulator with the bolt.

      Bolt (D) 

      Torque: 72 N*m (734 kgf*cm, 53 ft.*lbf) 

    5. Install the vacuum hose to the front engine mounting insulator.
    6. Engage the 2 clamps to install the vacuum hoses to the front engine mounting insulator.
    7. Install the No. 1 radiator bracket to the front engine mounting bracket with the bolt.

      Torque: 19 N*m (194 kgf*cm, 14 ft.*lbf) 

    8. Engage the 4 clamps to install the radiator hose, vacuum hoses and No. 2 engine wire to the No. 1 radiator bracket.
  2. INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY 

    Refer to PROCEDURE - Step 70

  3. INSTALL NO. 1 ENGINE UNDER COVER 

    Refer to PROCEDURE - Step 71

  4. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH 

    Refer to PROCEDURE - Step 72

  5. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH 

    Refer to PROCEDURE - Step 73

  6. INSTALL VACUUM SWITCHING VALVE (for Active Control Engine Mount System) 

    Refer to INSTALLATION [08/2020 - ]