Installation [10/2022 - ]: Procedure
- INSTALL NO. 2 VOLTAGE INVERTER ASSEMBLY
- Install the 2 nuts.
Torque: 3.5 N.m (36 kgf/cm, 31 in.lbf)
- Install the No. 2 voltage inverter assembly with the 4 bolts.
Torque: 7.0 N.m (71 kgf/cm, 62 in.lbf)
- Install the 2 nuts.
- INSTALL NO. 2 CONSOLE BOX MOUNTING BRACKET
- Install the No. 2 console box mounting bracket with the 4 bolts.
Torque: 15 N.m (153 kgf/cm, 11 ft.lbf)
- Connect the 4 connectors and 2 clamps.
- Install the No. 2 console box mounting bracket with the 4 bolts.
- INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
Refer to INSTALLATION [07/2020 - ]
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Refer to PROCEDURE - Step 2
- INSTALL BATTERY HOLE COVER
Refer to PROCEDURE - Step 57
- INSTALL REAR NO. 2 FLOOR BOARD
Refer to PROCEDURE - Step 59