Installation [07/2020 - ]: Procedure
- INSTALL OIL COOLER ASSEMBLY
- w/ Filter
- Install a new oil control valve filter to the cylinder block sub-assembly.
- Install 2 new oil cooler gaskets to the oil cooler assembly.
- Install the oil cooler assembly to the cylinder block sub-assembly with the 4 bolts.
Torque: 16 N*m (163 kgf*cm, 12 ft.*lbf)
- Connect the No. 1 water by-pass hose and No. 2 water by-pass hose to the oil cooler assembly, and slide the 2 clips to secure them.
- w/ Filter
- ADD ENGINE OIL
Refer to PROCEDURE - Step 5 [07/2020 - 12/2021] , or refer to PROCEDURE - Step 5 [12/2021 - 10/2023] , or refer to PROCEDURE - Step 5 [10/2023 - ]
- ADD ENGINE COOLANT (for Engine)
Refer to PROCEDURE - Step 2 [07/2020 - 12/2021] , or refer to PROCEDURE - Step 2 [12/2021 - ]
- CHECK ENGINE OIL LEVEL
Refer to PROCEDURE - Step 1 [07/2020 - 10/2023] , or refer to PROCEDURE - Step 1 [10/2023 - ]
- INSPECT FOR ENGINE OIL LEAK
Refer to PROCEDURE - Step 6 [07/2020 - 12/2021] , or refer to PROCEDURE - Step 6 [12/2021 - 10/2023] , or refer to PROCEDURE - Step 6 [10/2023 - ]
- INSPECT FOR COOLANT LEAK (for Engine)
Refer to PROCEDURE - Step 3 [07/2020 - 12/2021] , or refer to PROCEDURE - Step 3 [12/2021 - ]
- INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
See step 6