Installation [03/2019 - 03/2020]: Procedure
- INSTALL NO. 1 TURBO WATER PIPE SUB-ASSEMBLY
HINT:
Perform this procedure only when replacement of the turbocharger sub-assembly is necessary.
See step 1
- INSTALL INLET TURBO OIL PIPE SUB-ASSEMBLY
HINT:
Perform this procedure only when replacement of the turbocharger sub-assembly is necessary.
See step 1
- INSTALL NO. 2 TURBO WATER PIPE SUB-ASSEMBLY
HINT:
Perform this procedure only when replacement of the turbocharger sub-assembly is necessary.
See step 1
- INSPECT THE COMPONENTS PRIOR TO INSTALLATION OF THE TURBOCHARGER SUB-ASSEMBLY
- Check the outlet turbo oil pipe and inlet turbo oil pipe sub-assembly for contamination, obstruction and damage: clean or replace if necessary.
HINT:
If the outlet turbo oil pipe and/or inlet turbo oil pipe sub-assembly are heavily contaminated, we recommend changing the engine oil and the oil filter.3
- Check the No. 1 turbo water pipe sub-assembly and No. 2 turbo water pipe sub-assembly for the turbocharger sub-assembly for contamination, obstruction and damage: clean or replace if necessary.
- Check all bolt connections and cable connections for correct fit.
- Check air cleaner for contamination and clean or replace as needed.
- Check correct functioning of ventilation hose.
- Check the outlet turbo oil pipe and inlet turbo oil pipe sub-assembly for contamination, obstruction and damage: clean or replace if necessary.
- INSTALL TURBOCHARGER SUB-ASSEMBLY
- Check screw-in depth (A) of the E6 stud bolts (1); if necessary, screw the stud bolts in further or unscrew.NOTE:
Secure the E6 stud bolts (1) with screw locking.
Adhesive
Screw Lock Loctite 273, High Strength
Standard
Dimension (A) = 30 mm (1.18 in.)
- Clean sealing surfaces (1) on the exhaust manifold and on the cylinder head sub-assembly.NOTE:
- Damage to the surface.
- The use of metal-cutting tools (e.g. emery cloth) to clean the surfaces can damage them and lead to leaks or engine damage.
- Do not use any metal-cutting tools.
- Replace exhaust manifold to head gaskets.
- Position the exhaust manifold to head gaskets (1) on the cylinder head sub-assembly.
HINT:
Make sure the exhaust manifold to head gaskets (1) are positioned correctly.
- Install turbocharger sub-assembly (1) in the direction of the arrow.
HINT:
Protect the turbocharger sub-assembly (1) from falling.
- Replace the nuts on the turbocharger sub-assembly.
- Tighten nuts.
Torque: 18 N.m (184 kgf/cm, 13 ft.lbf)
- Replace the T40 bolt.
- Tighten the T40 bolt on the turbocharger sub-assembly.
Torque: 19 N.m (194 kgf/cm, 14 ft.lbf)
- Install the No. 1 turbo water pipe sub-assembly in the cylinder block sub-assembly and tighten the T30 bolt.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Tighten down the T30 bolt.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Fill turbocharger sub-assembly up to the top with engine oil using the inlet turbo oil pipe sub-assembly connection.
Engine oil
Toyota Genuine Motor Oil SN 0W-20 C5 for GR Toyota Supra
HINT:
- Technically suitable engine oils for BMW Group engines
- Observe the sign in the engine compartment! Only pour in approved engine oil with the correct SAE viscosity classification.
- Check screw-in depth (A) of the E6 stud bolts (1); if necessary, screw the stud bolts in further or unscrew.
- CONNECT INLET TURBO OIL PIPE SUB-ASSEMBLY
- Position turbo oil inlet pipe sub-assembly.
- Tighten down the T30 bolt.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- CONNECT NO. 2 TURBO WATER PIPE SUB-ASSEMBLY
- Tighten the T30 bolt on the holder of the No. 2 turbo water pipe sub-assembly.
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Connect the coolant hose.
- Tighten the T30 bolt on the holder of the No. 2 turbo water pipe sub-assembly.
- INSTALL OUTLET TURBO OIL PIPE
See step 1
- INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY
Refer to INSTALLATION [03/2019 - ]
- INSTALL INLET COMPRESSOR ELBOW
See step 1
- INSTALL VENTILATION HOSE
See step 2
- INSTALL NO. 2 AIR CLEANER HOSE
Refer to INSTALLATION [03/2019 - ]
- INSTALL EXHAUST PIPE ASSEMBLY
Refer to INSTALLATION [03/2019 - ]
- INSTALL STEERING LINK ASSEMBLY
Refer to INSTALLATION [03/2019 - 07/2020]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to INSTALLATION [03/2019 - ]
- ADD ENGINE COOLANT (for High Temperature)
Refer to REPLACEMENT [03/2019 - ]
- INSPECT FOR COOLANT LEAK (for High Temperature)
Refer to PROCEDURE - Step 1
- INSPECT FOR EXHAUST GAS LEAK
See step 7
- INSTALL CHECK ENGINE OIL LEVEL
Refer to PROCEDURE - Step 1