LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2021 >> Sequoia TRD Pro >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge / Display (Service Information) >> Combination Meter >> Installation [08/2015 - 08/2017] >> Procedure

Installation [08/2015 - 08/2017]: Procedure

  1. INSTALL COMBINATION METER ASSEMBLY 
    1. Connect the connector and attach the wire harness clamp.
    2. Install the combination meter assembly with the 4 screws.
  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY 

    Refer to PROCEDURE - Step 45

  3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 54

  4. INSTALL INSTRUMENT SIDE PANEL LH 

    Refer to PROCEDURE - Step 56

  5. INSTALL COWL SIDE TRIM BOARD LH 

    Refer to PROCEDURE - Step 46

  6. INSTALL FRONT DOOR SCUFF PLATE LH 

    Refer to PROCEDURE - Step 48

  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [08/2015 - 08/2017] ).

    Torque: 5.4 N.m (55 kgf/cm, 48 in.lbf) 

  8. CHECK SRS WARNING LIGHT 

    (Refer to DIAGNOSIS SYSTEM [08/2015 - 08/2017] )